Tennant Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Jul 2026 to Sep 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 530 18th Av | remove door and infill 4'-0" of exterior wall to match (e) siding. reframe side window for new replacement window. demo existing lightwell stair (not required means of egress)Details
remove door and infill 4'-0" of exterior wall to match (e) siding. reframe side window for new replacement window. demo existing lightwell stair (not required means of egress) | $2,000 |