Back to kitchen remodel contractors
Td Builder Llc
- Based in
- San Mateo
- On San Francisco permits
- Jan 2019 to Mar 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 17 days from filing to permit and 430 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2022 | Completed final sign-off Nov 2023 | 3692 Folsom St | revision to pa#202208100281 for an increased scope (from kitchen and bath renovation) to now include the expansion of condition living space to the 1st floor containing a new bedroom with ensuite bath, family room, and laundry; reconfigure of extg kitchen, bedroom and bath at 2nd level.Details
revision to pa#202208100281 for an increased scope (from kitchen and bath renovation) to now include the expansion of condition living space to the 1st floor containing a new bedroom with ensuite bath, family room, and laundry; reconfigure of extg kitchen, bedroom and bath at 2nd level. | $150,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2023 | 3692 Folsom St | remove interior finishes and fixtures throughout. no structural work - all structural elements to remain in place. r/r kitchen and bath in kind.Details
remove interior finishes and fixtures throughout. no structural work - all structural elements to remain in place. r/r kitchen and bath in kind. | $2,000 |
| Apr 5, 2022 | Completed final sign-off Dec 2022 | 460 Point Lobos Av | to comply with nov#200854394: remodel of kitchen: new cabinets and counters. remodel of bathroom: remodel and add shower. remove patio slider and install new window (non street visible).Details
to comply with nov#200854394: remodel of kitchen: new cabinets and counters. remodel of bathroom: remodel and add shower. remove patio slider and install new window (non street visible). | |
| Jan 14, 2019 | Completed final sign-off Dec 2023 | 876 Elizabeth St | (1) story vertical addition by roof deck addition @ 2nd fl east elevation. (n) habitable space below (e) 2nd fl. remodel kitchen & general renovation of 2nd flDetails
(1) story vertical addition by roof deck addition @ 2nd fl east elevation. (n) habitable space below (e) 2nd fl. remodel kitchen & general renovation of 2nd fl | $500,000 |