Back to kitchen remodel contractors
Tauscher Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Jul 2024
- Last 24 months
- 0 permits filed
36 permits since 2000: 20 completed, 1 in progress, 5 never finaled, 10 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 8 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2022 | Completed final sign-off Oct 2022 | 78 Wawona St | replace kitchen sink, countertop, lower cabinets. add dishwasher. extend countertop & lower cabinets into breakfast area. install washer and dryer.Details
replace kitchen sink, countertop, lower cabinets. add dishwasher. extend countertop & lower cabinets into breakfast area. install washer and dryer. | $26,000 |
| Jan 10, 2017 | Never finaled issued Jul 2017, no final | 1471 05th Av | horizontal addition at rear. remodel kitchen & half bath, new master bath. new windows at selected locations.Details
horizontal addition at rear. remodel kitchen & half bath, new master bath. new windows at selected locations. | $150,000 |
| Dec 5, 2014 | Completed final sign-off Mar 2015 | 53 Walter St | remove existing kitchen cabinets and replace with new. new dishwasher, stove and sink.Details
remove existing kitchen cabinets and replace with new. new dishwasher, stove and sink. | $5,500 |
| Feb 5, 2009 | Completed final sign-off Nov 2009 | 2525 Gough St | demo bath fixtures and finishes in 2527 and replace in extg location. add new cabinets in 2527 in kitchen. add new storage room at rear of grade level.Details
demo bath fixtures and finishes in 2527 and replace in extg location. add new cabinets in 2527 in kitchen. add new storage room at rear of grade level. | $50,000 |
| Aug 17, 2007 | Completed final sign-off Jan 2008 | 1159 Green St | work in unit#3: new kitchen flooring & cabinets. majority of lumens supplied by fluorescent lighting.Details
work in unit#3: new kitchen flooring & cabinets. majority of lumens supplied by fluorescent lighting. | $10,000 |