Back to bathroom remodel contractors
Target Construction Llc
- Based in
- San Mateo
- On San Francisco permits
- May 2006 to Oct 2024
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2022 | In progress issued Mar 2024 | 2888 Harrison St | interior remodel to (e) 2-family dwelling. relocate & remodel (e) kitchens and bathrooms to create new bedrooms, bathrooms, and washer/dryer machines in both units. replace windows at rear and lightwell, not visible from street.Details
interior remodel to (e) 2-family dwelling. relocate & remodel (e) kitchens and bathrooms to create new bedrooms, bathrooms, and washer/dryer machines in both units. replace windows at rear and lightwell, not visible from street. | $200,000 |
| Oct 2, 2017 | Completed final sign-off Dec 2017 | 1060 Pine St | apt 12: kitchen: replace cabinets, replace sink, electrical outlets; bathroom: replace vanity, sink, outlets, install shower panls, toiklet, replace toilet. replace electrical outlets throughout.Details
apt 12: kitchen: replace cabinets, replace sink, electrical outlets; bathroom: replace vanity, sink, outlets, install shower panls, toiklet, replace toilet. replace electrical outlets throughout. | $14,000 |
| Jul 26, 2017 | Completed final sign-off Oct 2017 | 1060 Pine St | apt 2 - remodel kitchen & bathroom. install cabients, countertop, sink, new stove, refrigerator, faucet in kitchen. replace tub, pedestal sink, 36"x8" wall at bathtub, artifical wall panels around tub, replace toilet, new faucet for tub.Details
apt 2 - remodel kitchen & bathroom. install cabients, countertop, sink, new stove, refrigerator, faucet in kitchen. replace tub, pedestal sink, 36"x8" wall at bathtub, artifical wall panels around tub, replace toilet, new faucet for tub. | $25,000 |
| Jul 26, 2017 | Completed final sign-off Oct 2017 | 1060 Pine St | apt 1 - remodel bathroom - replace tub, pedestal sink, 36"x8" wall at bathtub, replace toilet, pedestal sink, artificial panes around tub, new faucet for tub.Details
apt 1 - remodel bathroom - replace tub, pedestal sink, 36"x8" wall at bathtub, replace toilet, pedestal sink, artificial panes around tub, new faucet for tub. | $12,000 |
| Nov 23, 2016 | Expired or cancelled expired Jan 2018 | 72 Ney St | kitchen and bathroom and living room remodel. replace windows in rear. replace furnace, water heater. electrical and plumbingDetails
kitchen and bathroom and living room remodel. replace windows in rear. replace furnace, water heater. electrical and plumbing | $40,000 |
| Oct 13, 2016 | Completed final sign-off Jul 2017 | 828 Jones St | unit # 34: kitchen remodel - replace wall cabinets, replace kitchen lights min. 50% he. bathroom: install tile, pedestal, shower pan - door - replace light (ceiling) replace min 1 he; existing hood/ 13r fan remain same. n/a maher ord. 155-13Details
unit # 34: kitchen remodel - replace wall cabinets, replace kitchen lights min. 50% he. bathroom: install tile, pedestal, shower pan - door - replace light (ceiling) replace min 1 he; existing hood/ 13r fan remain same. n/a maher ord. 155-13 | $16,000 |
| Sep 27, 2016 | Completed final sign-off Jul 2017 | 828 Jones St | replace cabinets, counter, dishwasher - kitchen (1) unit 46. bathroom: replacing tub, sink wall tile; install floor tile. (1 bathroom)Details
replace cabinets, counter, dishwasher - kitchen (1) unit 46. bathroom: replacing tub, sink wall tile; install floor tile. (1 bathroom) | $25,000 |