Tam Woot Remodeling
- Based in
- San Francisco,
- On San Francisco permits
- Feb 2000 to Apr 2026
- Last 24 months
- 4 permits filed
123 permits since 2000: 105 completed, 1 in progress, 8 never finaled, 9 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | Completed final sign-off May 2026 | 339 Madison St | 1/f: add 1 bedroom, 1 family room, & 1 new bathroom. 2/f: reconfigure (e) kitchen & interior staircase. convert 1 (e) bedroom into master suite. dryrot repair at front.Details
1/f: add 1 bedroom, 1 family room, & 1 new bathroom. 2/f: reconfigure (e) kitchen & interior staircase. convert 1 (e) bedroom into master suite. dryrot repair at front. | $150,000 |
| Nov 3, 2021 | Completed final sign-off Aug 2023 | 1279 39th Av | infill 1/f rear below (e) 2/f. add family room, 2 bedrooms,2baths,2 closets on1/f.remodel (e) kitchen on 2/f,reconfig interior stairs,relocate (e) bath & add 1 bath on 2/f.remove lightwell staircase & infill 2/f. window replacment throughout. stucco repair at front.Details
infill 1/f rear below (e) 2/f. add family room, 2 bedrooms,2baths,2 closets on1/f.remodel (e) kitchen on 2/f,reconfig interior stairs,relocate (e) bath & add 1 bath on 2/f.remove lightwell staircase & infill 2/f. window replacment throughout. stucco repair at front. | $125,000 |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 2318 45th Av | "repair" front stair existing landing less than 50 percent restucco at the front bay window approximately 10 x 15 replace siding at existing lightwell and rear wall at penthouse - peplace existing one door two windows not visable form the street.Details
"repair" front stair existing landing less than 50 percent restucco at the front bay window approximately 10 x 15 replace siding at existing lightwell and rear wall at penthouse - peplace existing one door two windows not visable form the street. | $14,700 |
| Jun 30, 2015 | Expired or cancelled suspend Jan 2016 | 1155 Monterey Bl | relocate (e) bath, add deck @ rear, add one ma bath, entertainment, 2 bedrooms, one wet bar on garage level. remodel int stair per plan, ext wall finish (stucco)repair in kind, remove 2 (e) post @ garage level. remove non-bearing wall, relocated kitchen & dining area, add decks, add bath @ main flr.Details
relocate (e) bath, add deck @ rear, add one ma bath, entertainment, 2 bedrooms, one wet bar on garage level. remodel int stair per plan, ext wall finish (stucco)repair in kind, remove 2 (e) post @ garage level. remove non-bearing wall, relocated kitchen & dining area, add decks, add bath @ main flr. | $60,000 |
| Oct 19, 2011 | Completed final sign-off Dec 2011 | 4232 Fulton St | repair (e) stairs at side wall. replace 2-landings, replace one (e) side door, less than 50% of stairs.Details
repair (e) stairs at side wall. replace 2-landings, replace one (e) side door, less than 50% of stairs. | $4,500 |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 730 12th Av | repair 1 (e) wood stair landing & some steps. less than 50%, not visible from streetDetails
repair 1 (e) wood stair landing & some steps. less than 50%, not visible from street | $3,300 |
| Sep 19, 2005 | Completed final sign-off Oct 2005 | 4814 Fulton St | repair existing side wood stairs landing and replace less than 50% existing porch door. not visibleDetails
repair existing side wood stairs landing and replace less than 50% existing porch door. not visible | $3,500 |
| Aug 19, 2005 | Completed final sign-off Sep 2005 | 1911 29th Av | restucco stair well wall at front approx 150 sfDetails
restucco stair well wall at front approx 150 sf | $3,500 |
| Mar 14, 2005 | Completed final sign-off Apr 2005 | 240 Vasquez Av | restucco and cut dry rot damaged at stair way side wall at front and left rear corner approximatelyDetails
restucco and cut dry rot damaged at stair way side wall at front and left rear corner approximately | $5,000 |
| Mar 4, 2004 | Expired or cancelled expired Sep 2004 | 120 San Fernando Wy | replace existing front stair dry rot landing in kindDetails
replace existing front stair dry rot landing in kind | $5,500 |
| Mar 4, 2004 | Completed final sign-off May 2004 | 139 Monticello St | remodel existing kitchen, 2nd flr. repair existing stair on front landing and railingDetails
remodel existing kitchen, 2nd flr. repair existing stair on front landing and railing | $13,800 |
| May 1, 2000 | Completed final sign-off Jun 2000 | 2 Gennessee St | replace (e) stair landing restucco railing stringers to remainDetails
replace (e) stair landing restucco railing stringers to remain | $5,000 |