Back to bathroom remodel contractors
Taj Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2024 to Aug 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 150 Lombard St | unit 903: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head.Details
unit 903: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head. | $50,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 2323 14th Av | 2/f -bathroom remodeling convert full bathroom to a hlaf bath and extend full bathroom, upgrade plumbing, upgrade electrical, install insulation to entire bathroom, convert walking shower to bath tub, install double vanity and 24' vaniaty for half bathr, add toilet for full bathroom, drywalls, tilesDetails
2/f -bathroom remodeling convert full bathroom to a hlaf bath and extend full bathroom, upgrade plumbing, upgrade electrical, install insulation to entire bathroom, convert walking shower to bath tub, install double vanity and 24' vaniaty for half bathr, add toilet for full bathroom, drywalls, tiles | $45,600 |