Permit GraphShortlistSan Francisco building permits since 2000

Taj Construction

Contractor license
685566
State license record
Based in
San Francisco
On San Francisco permits
Jan 2024 to Aug 2026
Last 24 months
3 permits filed

5 permits since 2000: 3 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 3Bathroom remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Aug 4, 2026In progress
issued Aug 2026
150 Lombard Stunit 903: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head.
Details
Permit
202608046062
Permit issued
Aug 4, 2026

unit 903: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head.

Open the permit page

$50,000
Feb 14, 2025Completed
final sign-off Aug 2025
525 Valencia Sttenant improvement - remodel (e) restaurant with new opening between dining and kitchen. replace front door. mep deferred.
Details
Permit
202502140435
Permit issued
Jun 5, 2025
Final sign-off
Aug 29, 2025

tenant improvement - remodel (e) restaurant with new opening between dining and kitchen. replace front door. mep deferred.

Open the permit page

$15,000
Nov 26, 2024Completed
final sign-off Dec 2024
167 Leland Avrevision to 202406204877: reduced ada counter size 36", new walk in refrigerator.
Details
Permit
202411265764
Permit issued
Dec 4, 2024
Final sign-off
Dec 13, 2024

revision to 202406204877: reduced ada counter size 36", new walk in refrigerator.

Open the permit page

$16,000
Jun 20, 2024Completed
final sign-off Dec 2024
167 Leland Avrepair (e) kitchen floor quarry tiile. install new steamer and skillet under hood (less than 400lbs).
Details
Permit
202406204877
Permit issued
Jun 24, 2024
Final sign-off
Dec 13, 2024

repair (e) kitchen floor quarry tiile. install new steamer and skillet under hood (less than 400lbs).

Open the permit page

$3,000
Jan 12, 2024In progress
issued Jan 2024
2323 14th Av2/f -bathroom remodeling convert full bathroom to a hlaf bath and extend full bathroom, upgrade plumbing, upgrade electrical, install insulation to entire bathroom, convert walking shower to bath tub, install double vanity and 24' vaniaty for half bathr, add toilet for full bathroom, drywalls, tiles
Details
Permit
202401123894
Permit issued
Jan 12, 2024

2/f -bathroom remodeling convert full bathroom to a hlaf bath and extend full bathroom, upgrade plumbing, upgrade electrical, install insulation to entire bathroom, convert walking shower to bath tub, install double vanity and 24' vaniaty for half bathr, add toilet for full bathroom, drywalls, tiles

Open the permit page

$45,600