Back to kitchen remodel contractors
Tae S West General Contractor
- Based in
- Daly City
- On San Francisco permits
- Nov 2004 to May 2012
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 137 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2011 | Completed final sign-off Jan 2012 | 29 Roselyn Tr | remodel existing kitchen, no structural or changes in envelope.Details
remodel existing kitchen, no structural or changes in envelope. | $8,000 |
| Jun 24, 2011 | Completed final sign-off Feb 2012 | 2459 17th Av | enclosed (e) lightwells located left and right sides of the building. remodel (e) kitchen and two bathrooms at second floor. add (n) office at second floor, add 2-skylights.Details
enclosed (e) lightwells located left and right sides of the building. remodel (e) kitchen and two bathrooms at second floor. add (n) office at second floor, add 2-skylights. | $28,000 |
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 707 Kansas St | filling in covered rear porch-converting to conditioned space includes: master bedroom, sitting area, 3 bathrooms, laundry & closets. reconfigure & renovate kitchen, living & dining rooms & add power room at 2nd floorDetails
filling in covered rear porch-converting to conditioned space includes: master bedroom, sitting area, 3 bathrooms, laundry & closets. reconfigure & renovate kitchen, living & dining rooms & add power room at 2nd floor | $185,000 |
| Nov 14, 2007 | Expired or cancelled expired Jul 2008 | 100 Roanoke St | remodel extg 1 kitchen and 1 bath on 2nd floorDetails
remodel extg 1 kitchen and 1 bath on 2nd floor | $25,000 |