Back to kitchen remodel contractors
Tadgh Patrick Mc Sweeney
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2000 to Oct 2014
- Last 24 months
- 0 permits filed
40 permits since 2000: 36 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2012 | Completed final sign-off Sep 2012 | 46 Sharon St | work at 48 sharon st. only: replace (e) kitchen cabinets, same ly-out. one non-structural kitchen remodel.Details
work at 48 sharon st. only: replace (e) kitchen cabinets, same ly-out. one non-structural kitchen remodel. | $18,000 |
| Sep 15, 2011 | Completed final sign-off Aug 2014 | 648 Fillmore St | replacing existing kitchen cabinets and counter tops, including lighting.Details
replacing existing kitchen cabinets and counter tops, including lighting. | $25,000 |
| Jul 28, 2011 | Completed final sign-off Mar 2012 | 531 Waller St | replace existing kitchen cabinets, repl vanity and bath tub in main bathrm, install new washer, dryer in hallway closet. light comply with cec 150(k) no change to door windows and walls; dryer exhaust through lightwell terminate 3 from property line, openings, length limited to 14' maxDetails
replace existing kitchen cabinets, repl vanity and bath tub in main bathrm, install new washer, dryer in hallway closet. light comply with cec 150(k) no change to door windows and walls; dryer exhaust through lightwell terminate 3 from property line, openings, length limited to 14' max | $17,000 |
| Apr 21, 2005 | Completed final sign-off Sep 2005 | 3649 Market St | install new kitchen cabs, -same existing designDetails
install new kitchen cabs, -same existing design | $90,000 |
| Oct 3, 2001 | Completed final sign-off Mar 2002 | 124 Cabrillo St | replace exist kitchen cabinets, replace damaged sheetrock in bathroom.Details
replace exist kitchen cabinets, replace damaged sheetrock in bathroom. | $14,900 |