Back to bathroom remodel contractors
T W Y Inc
- Based in
- Foster City
- On San Francisco permits
- Aug 2004 to May 2026
- Last 24 months
- 2 permits filed
13 permits since 2000: 8 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 20 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2026 | Completed final sign-off Jun 2026 | 1954 Stockton St | shower top area wall reapir. bathroom remodel enclosure in kind. drywall remove & new hardie backer wall underneath inspect for water damage. new building paper before heardie backer. new insulation r15. new tile finish 5/8" type x sheetrock. remodel in kind.Details
shower top area wall reapir. bathroom remodel enclosure in kind. drywall remove & new hardie backer wall underneath inspect for water damage. new building paper before heardie backer. new insulation r15. new tile finish 5/8" type x sheetrock. remodel in kind. | $5,000 |
| Feb 10, 2016 | Completed final sign-off Jan 2017 | 1814 Union St | retail space remodel. add 2 ada ramps, add ada bathroom, signage, minor electrical and plumbing work.new 2 hr. ceiling separationDetails
retail space remodel. add 2 ada ramps, add ada bathroom, signage, minor electrical and plumbing work.new 2 hr. ceiling separation | $100,000 |
| Apr 6, 2012 | Completed final sign-off Nov 2012 | 119 06th Av | remodel kitchen, bathroom and bedroom. replace (3) wood windows, not visible from street. all egress to meet st clear opening. non-bearing wall removed in kitchen and bathroom.Details
remodel kitchen, bathroom and bedroom. replace (3) wood windows, not visible from street. all egress to meet st clear opening. non-bearing wall removed in kitchen and bathroom. | $95,000 |