Back to bathroom remodel contractors
T T K Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Oct 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 25 completed, 5 never finaled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 never finaled. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2024 | Completed final sign-off Sep 2024 | 3618 22nd St | unit #2: replace sheetrock in kitchen, bathroom, bedroom, and garage ceiling. partial kitchen and bath remodel where cabinets and fixtures removed to replace drywall.Details
unit #2: replace sheetrock in kitchen, bathroom, bedroom, and garage ceiling. partial kitchen and bath remodel where cabinets and fixtures removed to replace drywall. | $8,000 |
| May 1, 2023 | Completed final sign-off Nov 2023 | 1244 Felton St | 1st fl, add new family room, new bedroom, home office, and remodel e bathDetails
1st fl, add new family room, new bedroom, home office, and remodel e bath | $87,890 |
| Mar 21, 2023 | Completed final sign-off May 2024 | 2701 Lawton St | 1/f: new family room and new full bathroom. replace water heater and furnace. relocate laundry at 2/f, remodel (e) bathroom and kitchen; new lighting and outets to entire bldg. replace all windows. replace siding at rear dry rot repairDetails
1/f: new family room and new full bathroom. replace water heater and furnace. relocate laundry at 2/f, remodel (e) bathroom and kitchen; new lighting and outets to entire bldg. replace all windows. replace siding at rear dry rot repair | $78,600 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 242 Romain St | convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code.Details
convert 260sqft of exisitng garage into new bathroom and closet at the middle flr. construct new separation walls per plan. use existing plumbing and mechanical connections. add new electrical circuits per code. | $50,000 |
| Sep 22, 2020 | Completed final sign-off Nov 2020 | 3395 Balboa St | apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway.Details
apt 3: remodel kitchen & bathroom. change electrical panel from closet to hallway. | $18,000 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 1986 42nd Av | 2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms.Details
2/f: remodeling (e) ktichen (remove wall), converting (e) bathroom into 2 bathrooms. build new closets into (e) bedrooms. | $45,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 3395 Balboa St | replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchenDetails
replace master bathroom, bath top and faucet, tile. replace kitchen cabinet, tile, relocation electrical from closet to hallway. replace some locations 5'x 8', 7'x 12' kitchen | $18,000 |
| Dec 14, 2016 | Completed final sign-off Mar 2018 | 806 Junipero Serra Bl | 1st flr: construct new interior walls for new bathroom, bedroom and laundry, new rear conc. patio, new water heater.Details
1st flr: construct new interior walls for new bathroom, bedroom and laundry, new rear conc. patio, new water heater. | $35,000 |
| Sep 22, 2016 | Completed final sign-off Jan 2017 | 2437 Ortega St | 1st floor - construct new partition walls for new bedrooms, bathroom and laundry/media room; new door and window @ front lobby and replace (e) pier footing and posts; remove interior stairDetails
1st floor - construct new partition walls for new bedrooms, bathroom and laundry/media room; new door and window @ front lobby and replace (e) pier footing and posts; remove interior stair | $49,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 2437 Ortega St | alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet.Details
alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet. | $15,000 |
| Jun 24, 2016 | Completed final sign-off May 2017 | 2709 43rd Av | remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f.Details
remove kitchen at 1/f. remove non-loading wall at 1/f; rebuild (n)family room, home office and bath room at 1/f; add a rear deck & stair at 2/f. | $36,000 |
| Apr 9, 2012 | Completed final sign-off May 2012 | 3618 22nd St | replace bath tub, shower/bath faucet, tile. replace kitchen faucet, install new cabinets. 3 under-mounted cabinet lights. 6 recessed flourescent can lights. rmeove electrical panel from closet to hallways. lighting will comply with t-24Details
replace bath tub, shower/bath faucet, tile. replace kitchen faucet, install new cabinets. 3 under-mounted cabinet lights. 6 recessed flourescent can lights. rmeove electrical panel from closet to hallways. lighting will comply with t-24 | $10,000 |
| Jan 20, 2012 | Completed final sign-off Mar 2012 | 513 Vienna St | re-tile bathroom, change toilet, vanity, replace kitchen and cabinet, lighting shall be comply with title 24Details
re-tile bathroom, change toilet, vanity, replace kitchen and cabinet, lighting shall be comply with title 24 | $10,000 |
| Jun 30, 2011 | Completed final sign-off Nov 2011 | 862 29th Av | remodel bathroom @ second flr., in-kind. change light and plug.Details
remodel bathroom @ second flr., in-kind. change light and plug. | $5,000 |
| Dec 23, 2009 | Completed final sign-off Feb 2010 | 3618 22nd St | apt 33: kitchen and bath remodel. replace tub, change faucet. relocate kitchen cabinets. install 8 recessed lights in living room, switch electric panel from closet to hallway. 4 under cabinet lightsDetails
apt 33: kitchen and bath remodel. replace tub, change faucet. relocate kitchen cabinets. install 8 recessed lights in living room, switch electric panel from closet to hallway. 4 under cabinet lights | $12,000 |
| Aug 11, 2008 | Completed final sign-off Sep 2008 | 3618 22nd St | work @ apt# 23 only. remodel bathroom & kitchen. change electric panal from inside closet to outside closet in apt# 23. no structural work. no new lighting in kitchen. bath new lighting to be high efficancy or manual on auto off switch.Details
work @ apt# 23 only. remodel bathroom & kitchen. change electric panal from inside closet to outside closet in apt# 23. no structural work. no new lighting in kitchen. bath new lighting to be high efficancy or manual on auto off switch. | $17,000 |
| Jul 1, 2008 | Completed final sign-off Sep 2008 | 3618 22nd St | work on apt #25. remodel bathroom and kitchen . install 8 ceiling lighting change panel from closet to hallway.Details
work on apt #25. remodel bathroom and kitchen . install 8 ceiling lighting change panel from closet to hallway. | $8,000 |