Back to kitchen remodel contractors
T D Construction
- Based in
- Alameda
- On San Francisco permits
- Mar 2015 to Mar 2018
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 21 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2017 | Completed final sign-off Oct 2018 | 4524 Cabrillo St | kitchen & bath remodel at 2nd flr unit. convert study into bedroom and add one bathroomDetails
kitchen & bath remodel at 2nd flr unit. convert study into bedroom and add one bathroom | $120,000 |
| Dec 21, 2016 | Completed final sign-off Jan 2017 | 1668 18th Av | kitchen remodel: add circuits, add dishwasher, change cabinets, tile. add lights.Details
kitchen remodel: add circuits, add dishwasher, change cabinets, tile. add lights. | $16,000 |