Back to kitchen remodel contractors
T A A Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to Mar 2016
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 73 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 2778 21st St | bath 1: shower wall tile only, 2nd bath: install fibertub and back splash. replace kitchen cabinet, add 4 electrical circuits, install new furnace in attic.Details
bath 1: shower wall tile only, 2nd bath: install fibertub and back splash. replace kitchen cabinet, add 4 electrical circuits, install new furnace in attic. | $10,000 |
| Dec 5, 2011 | Completed final sign-off Jan 2012 | 146 Athens St | remodel (1) kitchen. replace cabinets, counter top. remodel (1) bathroom, replace tile - toilet, new vanity. new service electrical only for kitchen and bathroom.Details
remodel (1) kitchen. replace cabinets, counter top. remodel (1) bathroom, replace tile - toilet, new vanity. new service electrical only for kitchen and bathroom. | $18,000 |
| Nov 14, 2011 | Completed final sign-off Mar 2012 | 841 Dwight St | remodel kitchen, replace cabinet, counter top. remodel one bathroom, retile & replace toilet and new vanity.Details
remodel kitchen, replace cabinet, counter top. remodel one bathroom, retile & replace toilet and new vanity. | $13,000 |
| Jul 11, 2011 | Completed final sign-off Sep 2011 | 278 Parker Av | replace kitchen cabinets and counter top.Details
replace kitchen cabinets and counter top. | $7,000 |
| Jun 1, 2011 | Completed final sign-off Jul 2011 | 46 Wabash Tr | change kitchen cabinets and counter tops, light fixtures. comply with cec 150 (k). change bathroom fixtures and retile floor, new toilet and vanity. no structural changes, no walls relocation. work on 2nd floor only.Details
change kitchen cabinets and counter tops, light fixtures. comply with cec 150 (k). change bathroom fixtures and retile floor, new toilet and vanity. no structural changes, no walls relocation. work on 2nd floor only. | $16,000 |
| Mar 21, 2011 | Expired or cancelled cancelled Jul 2011 | 86 Wabash Tr | change kitchen cabinets and light fixtures, change bathroom fixtures and retile. new lighting comply with cec150(k)Details
change kitchen cabinets and light fixtures, change bathroom fixtures and retile. new lighting comply with cec150(k) | $9,000 |
| Mar 14, 2011 | Completed final sign-off Jul 2011 | 630 Presidio Av | changing kitchen cabinets, changing bathroom fixtures and re-tile, including lighting, exhaust fanDetails
changing kitchen cabinets, changing bathroom fixtures and re-tile, including lighting, exhaust fan | $7,000 |