Back to kitchen remodel contractors
Szeto Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2026
- Last 24 months
- 2 permits filed
13 permits since 2000: 9 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2018 | Completed final sign-off Dec 2018 | 1241 Broadway | remodel kitchen & bathroom, new cabinets, tile, replace (e) bathtubs w/shower, all work to be nonstructural, new fixtures in-kindDetails
remodel kitchen & bathroom, new cabinets, tile, replace (e) bathtubs w/shower, all work to be nonstructural, new fixtures in-kind | $25,000 |
| Dec 27, 2006 | Completed final sign-off Apr 2007 | 611 06th Av | replace (e) lath and plaster wall with new sheetrock, not to exceed 1/2 of all wall. remodel (e) 2 bathrooms, 1 kitchen. no structural work to be done. new electrical, plumbing throughout. all lighting to meet t24 requirements.Details
replace (e) lath and plaster wall with new sheetrock, not to exceed 1/2 of all wall. remodel (e) 2 bathrooms, 1 kitchen. no structural work to be done. new electrical, plumbing throughout. all lighting to meet t24 requirements. | $90,000 |
| Mar 6, 2002 | Expired or cancelled expired Sep 2002 | 663 Guerrero St | remodel kitchen, replace cabinets and counter top, new flooring and paintDetails
remodel kitchen, replace cabinets and counter top, new flooring and paint | $12,000 |
| Jan 13, 2000 | Expired or cancelled expired Jul 2000 | 2501 20th Av | remodel kitchen, bathroom, cabinets,etcDetails
remodel kitchen, bathroom, cabinets,etc | $15,000 |