Superior Structures
- Based in
- Novato
- On San Francisco permits
- Jul 2003 to Sep 2023
- Last 24 months
- 0 permits filed
73 permits since 2000: 48 completed, 12 never finaled, 13 expired or cancelled.
Of the 12 never-finaled permits, 1 is 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 35 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2015 | Completed final sign-off Sep 2015 | 60 Paramount Tr | converting basement space to master suite, add bathroom. replace existing windows in kind. new stairs. replace sliding door, new plumbing fixtures, install electrical to code. replace deck in kindDetails
converting basement space to master suite, add bathroom. replace existing windows in kind. new stairs. replace sliding door, new plumbing fixtures, install electrical to code. replace deck in kind | $40,000 |
| Apr 29, 2014 | Completed final sign-off Jul 2015 | 376 San Carlos St | to comply w/nov 201253741,201345051,201172213, - remodel of both units including bath & bedroom @ ground floor & bath on 3rd flr. all elect. including new panel,fuel plumbing,install heater unit. foundation work, excavation 6"to create 7'-6" head clearance. repair balcony/deck less than 50% in kind.Details
to comply w/nov 201253741,201345051,201172213, - remodel of both units including bath & bedroom @ ground floor & bath on 3rd flr. all elect. including new panel,fuel plumbing,install heater unit. foundation work, excavation 6"to create 7'-6" head clearance. repair balcony/deck less than 50% in kind. | $80,000 |
| Feb 10, 2010 | Completed final sign-off Jul 2010 | 560 Clipper St | interior & exterior remodel-infill skylight, demo bathoom & replace with new dining room, remodel bathroom & add power & bathroom, remodel 2 bedrooms, replace (e) windows & replace front facade materials in kind. replace (e) deck guardrails in kind & repair deck in kindDetails
interior & exterior remodel-infill skylight, demo bathoom & replace with new dining room, remodel bathroom & add power & bathroom, remodel 2 bedrooms, replace (e) windows & replace front facade materials in kind. replace (e) deck guardrails in kind & repair deck in kind | $121,500 |
| Oct 25, 2007 | Completed final sign-off Aug 2009 | 568 Clipper St | addition & modification @ front facade, addition at center to enclose new stair & add space, new deck @ rear, interior remodel & renovation @ all floors, including basement.Details
addition & modification @ front facade, addition at center to enclose new stair & add space, new deck @ rear, interior remodel & renovation @ all floors, including basement. | $450,000 |
| Nov 15, 2005 | Completed final sign-off Apr 2006 | 28 Kent St | rev. to pa32005/05/23/3147s1 dated 10/25/05 - add sliding glass door and deckDetails
rev. to pa32005/05/23/3147s1 dated 10/25/05 - add sliding glass door and deck | $20,000 |
| May 23, 2005 | Completed final sign-off Apr 2006 | 28 Kent St | rear deck & 2 sets double doors. unit 32-34Details
rear deck & 2 sets double doors. unit 32-34 | $30,000 |