Back to bathroom remodel contractors
Superior Structures
- Based in
- Novato
- On San Francisco permits
- Jul 2003 to Sep 2023
- Last 24 months
- 0 permits filed
73 permits since 2000: 48 completed, 12 never finaled, 13 expired or cancelled.
Of the 12 never-finaled permits, 1 is 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 18 completed, 4 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2018 | Completed final sign-off Jan 2019 | 2102 Baker St | remodel (2) bathrooms in kind. no structural work. provide gfci outlet and high efficacy lighting and exhaust fan. lighting per cec 150.0(k)Details
remodel (2) bathrooms in kind. no structural work. provide gfci outlet and high efficacy lighting and exhaust fan. lighting per cec 150.0(k) | $16,000 |
| Apr 10, 2018 | Expired or cancelled cancelled Jan 2026 | 2012 Baker St | remodel 2 bathroom in kind. (no structural work). provide gfci outlet & high eff lighting & exhaust fanDetails
remodel 2 bathroom in kind. (no structural work). provide gfci outlet & high eff lighting & exhaust fan | $16,000 |
| Oct 17, 2016 | Completed final sign-off Nov 2016 | 1190 Dolores St | revision to pa #201602230245 - unit #1190: remodel ktichen & bathroom - add wall between hall & bathroom per inspector requested drawings to clarify scope of work prior to finaling job.Details
revision to pa #201602230245 - unit #1190: remodel ktichen & bathroom - add wall between hall & bathroom per inspector requested drawings to clarify scope of work prior to finaling job. | |
| Aug 17, 2016 | Completed final sign-off Dec 2016 | 1650 Jackson St | apt 708: kitchen and bathroom remodel; all fixtures to be remain at same location and to comply with accessibility if req'd by original construction. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply w/ cec 150.0(k)3 and 150.0(k)5Details
apt 708: kitchen and bathroom remodel; all fixtures to be remain at same location and to comply with accessibility if req'd by original construction. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply w/ cec 150.0(k)3 and 150.0(k)5 | $25,000 |
| May 27, 2016 | Completed final sign-off May 2017 | 1188 Dolores St | comply w/physical inspection report #cc-7724: #1188: add bath, add slylight, reconfigure bath '1' plumbing fixtures. #1190: reconfigure bath '1' plbg fixtures,remov etoilet & sink from tube room. provide washer/dryer. #1192: rconfigure bath '1' plbg fixtures, remove sink from tube rm/add toilet.Details
comply w/physical inspection report #cc-7724: #1188: add bath, add slylight, reconfigure bath '1' plumbing fixtures. #1190: reconfigure bath '1' plbg fixtures,remov etoilet & sink from tube room. provide washer/dryer. #1192: rconfigure bath '1' plbg fixtures, remove sink from tube rm/add toilet. | $30,000 |
| May 24, 2016 | Completed final sign-off Mar 2017 | 1190 Dolores St | replace bathroom in kind to meet condo conversion requirements. add can lights in living room, install code compliant toilet in 1/2 bath, replace fireplace with self contained unit. fireplace to be gas direct vent type. flue through roof of top unit.Details
replace bathroom in kind to meet condo conversion requirements. add can lights in living room, install code compliant toilet in 1/2 bath, replace fireplace with self contained unit. fireplace to be gas direct vent type. flue through roof of top unit. | $15,000 |
| May 23, 2016 | Completed final sign-off Nov 2016 | 3259 Mission St | dry rot repair at the crawl space. new posts, beams and foundation. replace 2nd floor joists due to settlement. new surface drainage & remodel (e) bathrooms for ada complianceDetails
dry rot repair at the crawl space. new posts, beams and foundation. replace 2nd floor joists due to settlement. new surface drainage & remodel (e) bathrooms for ada compliance | $90,000 |
| Feb 23, 2016 | Completed final sign-off Nov 2016 | 1190 Dolores St | replace in kind one kitchen cabinets, fixtures, flooring. replace 2 bathroom fixtures, toilets, and vanities. 2 bath remodel.Details
replace in kind one kitchen cabinets, fixtures, flooring. replace 2 bathroom fixtures, toilets, and vanities. 2 bath remodel. | $35,000 |
| May 27, 2015 | Completed final sign-off Aug 2015 | 2283 Chestnut St | unit 5: revision to app#201505045253. add floor plan for unit 5; replace kitchen and bath. new drywall, insulation, plmbg and electrical. n/a for the maher.Details
unit 5: revision to app#201505045253. add floor plan for unit 5; replace kitchen and bath. new drywall, insulation, plmbg and electrical. n/a for the maher. | |
| May 4, 2015 | Completed final sign-off Aug 2015 | 2283 Chestnut St | unit # 4 and 5: replace kitchen cabs and bathooms. reframe bathroom wall and hallway. add 10 can lights. replace drywall. install new tub and bath fixtures.Details
unit # 4 and 5: replace kitchen cabs and bathooms. reframe bathroom wall and hallway. add 10 can lights. replace drywall. install new tub and bath fixtures. | $40,000 |
| Apr 29, 2015 | Completed final sign-off Sep 2015 | 60 Paramount Tr | converting basement space to master suite, add bathroom. replace existing windows in kind. new stairs. replace sliding door, new plumbing fixtures, install electrical to code. replace deck in kindDetails
converting basement space to master suite, add bathroom. replace existing windows in kind. new stairs. replace sliding door, new plumbing fixtures, install electrical to code. replace deck in kind | $40,000 |
| Nov 7, 2014 | Never finaled issued Nov 2014, no final | 2424 Jones St | remodel lower unit, replace kitchen cabinets, relocate bathroom, replace lighting, replace in kind existing windows & doors min u.4 glazing on windows; maher n/aDetails
remodel lower unit, replace kitchen cabinets, relocate bathroom, replace lighting, replace in kind existing windows & doors min u.4 glazing on windows; maher n/a | $125,000 |
| Oct 14, 2014 | Completed final sign-off Aug 2016 | 324 Collingwood St | first fl-construct 20'x16' 1 story rear yard addition w/2 bedrooms, remodel (e) bath & add 1/2 bath. second fl-construct roof deck over (n) 1st fl addition. n/a for maher ordinance.Details
first fl-construct 20'x16' 1 story rear yard addition w/2 bedrooms, remodel (e) bath & add 1/2 bath. second fl-construct roof deck over (n) 1st fl addition. n/a for maher ordinance. | $80,000 |
| Jun 2, 2014 | Completed final sign-off Sep 2016 | 621 Alvarado St | 1st flr: add 2 bathrooms, 1 bedroom & common spaces. replace north facade windows in kind,new windows are wood, double hung with ogee lugs; replace stucco on north facadeDetails
1st flr: add 2 bathrooms, 1 bedroom & common spaces. replace north facade windows in kind,new windows are wood, double hung with ogee lugs; replace stucco on north facade | $5,000 |
| May 21, 2014 | Completed final sign-off Sep 2016 | 621 Alvarado St | 3 floors renovation to 2 extg units in a residential bldg. renovation extg kitchen and bathrooms, upgrade extg mechanical, plmbg and electrical system, replace extg windows and doors in kind, replace extg exterior siding and roofing.Details
3 floors renovation to 2 extg units in a residential bldg. renovation extg kitchen and bathrooms, upgrade extg mechanical, plmbg and electrical system, replace extg windows and doors in kind, replace extg exterior siding and roofing. | $180,000 |
| Apr 29, 2014 | Completed final sign-off Jul 2015 | 376 San Carlos St | to comply w/nov 201253741,201345051,201172213, - remodel of both units including bath & bedroom @ ground floor & bath on 3rd flr. all elect. including new panel,fuel plumbing,install heater unit. foundation work, excavation 6"to create 7'-6" head clearance. repair balcony/deck less than 50% in kind.Details
to comply w/nov 201253741,201345051,201172213, - remodel of both units including bath & bedroom @ ground floor & bath on 3rd flr. all elect. including new panel,fuel plumbing,install heater unit. foundation work, excavation 6"to create 7'-6" head clearance. repair balcony/deck less than 50% in kind. | $80,000 |
| May 6, 2013 | Never finaled issued May 2013, no final | 2240 18th Av | revision to permit 201304225779, open up wall between kitchen & dining, flr 1: remodel (e) bdrm & (e0bath -relocate, replace rear windows, reconstruct interior stair to meet code, create master bedrm & bathroom @ frl 1Details
revision to permit 201304225779, open up wall between kitchen & dining, flr 1: remodel (e) bdrm & (e0bath -relocate, replace rear windows, reconstruct interior stair to meet code, create master bedrm & bathroom @ frl 1 | $22,000 |
| Apr 30, 2013 | Never finaled issued Apr 2013, no final | 2240 18th Av | remodel kitchen, remodel bathroom, repl toilet in powder room, led ltg in kithcne, fan in bathrm & powder rm, (100% high efficacy),kitchn: repl cabinets/repl floor, plmbg fixtures & stove, bathrm: repl toilet & sink & new tile @ tubDetails
remodel kitchen, remodel bathroom, repl toilet in powder room, led ltg in kithcne, fan in bathrm & powder rm, (100% high efficacy),kitchn: repl cabinets/repl floor, plmbg fixtures & stove, bathrm: repl toilet & sink & new tile @ tub | $22,000 |
| Mar 20, 2013 | Completed final sign-off Aug 2015 | 1 Newburg St | addition of a (n) 3rd fl with master bedroom, bath, closet, roof deck & (n) interior stair access to 3rd fl. fire sprinkler system to be provided under separate permit.Details
addition of a (n) 3rd fl with master bedroom, bath, closet, roof deck & (n) interior stair access to 3rd fl. fire sprinkler system to be provided under separate permit. | $200,000 |
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 1043 Francisco St | revision to app#201108293431. interior revision only. floor 2: reconfigure kitchen and delete bedroom and bathroom per original permit app #200806023436.Details
revision to app#201108293431. interior revision only. floor 2: reconfigure kitchen and delete bedroom and bathroom per original permit app #200806023436. | |
| Apr 28, 2010 | Completed final sign-off Jul 2010 | 580 Valencia St | light demolition of non bearing partitiion, demo existing bath and fixtures, misc drywall soffit, elec fixturesDetails
light demolition of non bearing partitiion, demo existing bath and fixtures, misc drywall soffit, elec fixtures | $6,000 |
| Feb 10, 2010 | Completed final sign-off Jul 2010 | 560 Clipper St | interior & exterior remodel-infill skylight, demo bathoom & replace with new dining room, remodel bathroom & add power & bathroom, remodel 2 bedrooms, replace (e) windows & replace front facade materials in kind. replace (e) deck guardrails in kind & repair deck in kindDetails
interior & exterior remodel-infill skylight, demo bathoom & replace with new dining room, remodel bathroom & add power & bathroom, remodel 2 bedrooms, replace (e) windows & replace front facade materials in kind. replace (e) deck guardrails in kind & repair deck in kind | $121,500 |
| Dec 6, 2005 | Completed final sign-off Jan 2006 | 28 Kent St | rev. to pa#2004/10/04/5846 move 1/2 bath, change one wall to open up kitchenDetails
rev. to pa#2004/10/04/5846 move 1/2 bath, change one wall to open up kitchen | $12,000 |
| Dec 28, 2004 | Expired or cancelled expired Mar 2007 | 101 Lombard St | replace bathtub with showerpan, countertops, toilets, add tile, 1 bath remodel. non stuctralDetails
replace bathtub with showerpan, countertops, toilets, add tile, 1 bath remodel. non stuctral | $2,000 |