Back to kitchen remodel contractors
Super Home Painting & Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Nov 2015
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 2 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2015 | Never finaled issued Apr 2015, no final | 1640 Vallejo St | unit 8 - remove existing kitchen & bath cabinets. install plumbing and electrical to new bath remodels. install fixtures and tile paint and installl flooring tile or granite. no walls to be removed. no structural. fire rated assemblies to be maintained.Details
unit 8 - remove existing kitchen & bath cabinets. install plumbing and electrical to new bath remodels. install fixtures and tile paint and installl flooring tile or granite. no walls to be removed. no structural. fire rated assemblies to be maintained. | $15,000 |