Back to bathroom remodel contractors
Super Home Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Nov 2023
- Last 24 months
- 0 permits filed
57 permits since 2000: 47 completed, 1 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 never finaled. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2023 | Completed final sign-off Oct 2023 | 56 Garcia Av | convert existing water closet into bathroom with shower & sink.Details
convert existing water closet into bathroom with shower & sink. | $12,000 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 627 San Bruno Av | remodel kitchen/bathroom , remove load bearing wall.Details
remodel kitchen/bathroom , remove load bearing wall. | $100,000 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 887 Castro St | interior renovation of (e) master bathroom, 91sf. new plumbing, electrical, inteiror finisehs and new exhause fan. no change to 9e) area, use, height, structural system, fenestration system.Details
interior renovation of (e) master bathroom, 91sf. new plumbing, electrical, inteiror finisehs and new exhause fan. no change to 9e) area, use, height, structural system, fenestration system. | $16,500 |
| Oct 29, 2021 | Completed final sign-off Apr 2023 | 245 Chester Av | interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures.Details
interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures. | $150,000 |
| May 11, 2021 | Completed final sign-off Jul 2021 | 1421 Golden Gate Av | update one bathroom (replace all fixtures without re-routing the plumbing & electrical lines). no walls moved, demos, added or installed. all existing layouts to remain unchanged.Details
update one bathroom (replace all fixtures without re-routing the plumbing & electrical lines). no walls moved, demos, added or installed. all existing layouts to remain unchanged. | $10,000 |
| Dec 12, 2018 | Completed final sign-off Dec 2019 | 338 Hearst Av | to comply with nov#200001430. r1)remove walls(interior) at upper floor. 2) re install wall between bedrooms. 3) reconfigure sink a bathroom. 4)reconf. entry stairs. 5) remodel extg kitchen.remodel& repair less than 50%Details
to comply with nov#200001430. r1)remove walls(interior) at upper floor. 2) re install wall between bedrooms. 3) reconfigure sink a bathroom. 4)reconf. entry stairs. 5) remodel extg kitchen.remodel& repair less than 50% | $35,000 |
| Oct 9, 2018 | Completed final sign-off Jan 2019 | 1967 34th Av | update batrhoom replace bath tub, shower head & faucet, tiles, toilet, sink, electric outlet & switches. 2nd floor. 5'x8'. the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged.Details
update batrhoom replace bath tub, shower head & faucet, tiles, toilet, sink, electric outlet & switches. 2nd floor. 5'x8'. the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged. | $8,900 |
| Sep 17, 2018 | Completed final sign-off Aug 2019 | 579 Fell St | (n) tankless water heater to replace (e) wather heater, bathroom alteration- reconfigure & add shower stall, widen opening between kitchen & dining, relace rear windows w/sliding door, new skylight at shower, new lighting fixtues at kitchenDetails
(n) tankless water heater to replace (e) wather heater, bathroom alteration- reconfigure & add shower stall, widen opening between kitchen & dining, relace rear windows w/sliding door, new skylight at shower, new lighting fixtues at kitchen | $18,000 |
| Aug 28, 2018 | Never finaled issued Sep 2018, no final | 38 Bryant St | unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanelDetails
unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanel | $10,000 |
| Aug 20, 2018 | Completed final sign-off Sep 2018 | 418 Victoria St | remodel bathroom (replace bathtub, shower head, fancet, tiles, toilet, sink, vanity, medicine cabinet, electrial outlets and switches) the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged.Details
remodel bathroom (replace bathtub, shower head, fancet, tiles, toilet, sink, vanity, medicine cabinet, electrial outlets and switches) the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged. | $8,800 |
| Apr 30, 2018 | Completed final sign-off Sep 2018 | 580 20th Av | update bathroom & kitchen (replace all fixtures & appliances). the job will be performed without re-routing the plumbing lines. no walls, removed, demoed, added or installed. all existing layouts to remain unchanged.Details
update bathroom & kitchen (replace all fixtures & appliances). the job will be performed without re-routing the plumbing lines. no walls, removed, demoed, added or installed. all existing layouts to remain unchanged. | $25,000 |
| Mar 7, 2018 | Completed final sign-off Dec 2018 | 92 Coventry Ct | update bathroom (replace bath tub, shower door, shower head and faucet, tiles, toilet, sink, medicine cabinet, electric outlet and switch) the job performed without reouting the plumbing lines. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
update bathroom (replace bath tub, shower door, shower head and faucet, tiles, toilet, sink, medicine cabinet, electric outlet and switch) the job performed without reouting the plumbing lines. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $7,800 |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl.Details
apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl. | $20,000 |
| Jul 25, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | apt 705: kitchen & bathroom remodel. as like, new fixtures.Details
apt 705: kitchen & bathroom remodel. as like, new fixtures. | $20,000 |