Sunshine Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2010 to May 2015
- Last 24 months
- 0 permits filed
9 permits since 2000: 3 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 never finaled. Typically 0 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2011 | Never finaled issued Oct 2011, no final | 790 Potrero Av | remodeling kitchen, replace cabinets. remodeling bathroom, replace tub. new water line for ice maker, range, sink. new bath tub, faucet, new bath tub. no structural work. replace outlets to gfi. new flourescnet light. (n) lighting comply w/cec 150(k).Details
remodeling kitchen, replace cabinets. remodeling bathroom, replace tub. new water line for ice maker, range, sink. new bath tub, faucet, new bath tub. no structural work. replace outlets to gfi. new flourescnet light. (n) lighting comply w/cec 150(k). | $30,000 |
| May 31, 2011 | Never finaled issued May 2011, no final | 570 Bright St | kitchen remodel at second floor: change cabinets, change lighting, install panel board, circuit breaker, run 1/2" copper pipe for ice maker, replace stop valves. no wall relocation.Details
kitchen remodel at second floor: change cabinets, change lighting, install panel board, circuit breaker, run 1/2" copper pipe for ice maker, replace stop valves. no wall relocation. | $17,000 |
| Nov 15, 2010 | Completed final sign-off Apr 2011 | 4401 Ocean Av | remodeling kitchen 13'x15' high efficiency lighting at least 505 by wattage. replace cabinets, counter tops, laminate floor hardwood flooring, lighting, not adding or moving any wall.Details
remodeling kitchen 13'x15' high efficiency lighting at least 505 by wattage. replace cabinets, counter tops, laminate floor hardwood flooring, lighting, not adding or moving any wall. | $26,984 |