Back to kitchen remodel contractors
Sunset Improvements
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Oct 2016
- Last 24 months
- 0 permits filed
15 permits since 2000: 10 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2014 | Completed final sign-off Jul 2014 | 1462 36th Av | replace exising kitchen cabinets, countertops and flooring. upgrade (e) outlets and water supply as necessary. lighting to comply with cec 150 (k)Details
replace exising kitchen cabinets, countertops and flooring. upgrade (e) outlets and water supply as necessary. lighting to comply with cec 150 (k) | $9,500 |
| Jan 2, 2014 | Completed final sign-off Mar 2014 | 1590 38th Av | kitchen remodel: remodel (e) kitchen cabinets, countertops & flooring. paint as necessary, no new wall & no (e) wall relocation. lighting in kitchen remodel shall comply with cec 150(k)8. minimum of 50% total rated wattage of permanent installed lighting.Details
kitchen remodel: remodel (e) kitchen cabinets, countertops & flooring. paint as necessary, no new wall & no (e) wall relocation. lighting in kitchen remodel shall comply with cec 150(k)8. minimum of 50% total rated wattage of permanent installed lighting. | $25,000 |
| May 23, 2008 | Never finaled issued Jun 2008, no final | 4305 24th St | remodel kitchen, master bathroom and powder rm on the 2nd floor. repair ex. foundation at the rear. replace ex. front entry stair. replace all ex. windows in-kindDetails
remodel kitchen, master bathroom and powder rm on the 2nd floor. repair ex. foundation at the rear. replace ex. front entry stair. replace all ex. windows in-kind | $58,000 |
| Nov 14, 2007 | Never finaled issued Nov 2007, no final | 4305 24th St | replace kitchen cabinets, countertops & flooring. replace bath fixtures & tile. repair existing plaster as needed.Details
replace kitchen cabinets, countertops & flooring. replace bath fixtures & tile. repair existing plaster as needed. | $14,500 |
| Feb 6, 2007 | Completed final sign-off May 2007 | 2666 40th Av | replace kitchen cabinets & countertop. replace (e) lighting with flourescent only.Details
replace kitchen cabinets & countertop. replace (e) lighting with flourescent only. | $17,000 |
| Aug 26, 2005 | Completed final sign-off Dec 2005 | 2162 26th Av | replace kitchen cabs and countertops - no structural workDetails
replace kitchen cabs and countertops - no structural work | $7,100 |