Back to kitchen remodel contractors
Sunset Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Jan 2007 to Feb 2017
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2017 | Completed final sign-off Mar 2018 | 811 Pierce St | re-do existing (4) baths and (1) kitchen, new tile, paint and replace cabinets.Details
re-do existing (4) baths and (1) kitchen, new tile, paint and replace cabinets. | $100,000 |
| Oct 22, 2010 | Completed final sign-off Jan 2011 | 1930 09th Av | kitchen remodel: repl 2 windows in kitchen, replace cabinets and counter; upgrade kitchen electrical and lighting, area 10'x13': windows u-factor o.40 max. high efficacy lighting at least 50% by wattageDetails
kitchen remodel: repl 2 windows in kitchen, replace cabinets and counter; upgrade kitchen electrical and lighting, area 10'x13': windows u-factor o.40 max. high efficacy lighting at least 50% by wattage | $16,000 |
| Jan 22, 2007 | Completed final sign-off May 2007 | 119 Corona St | remodel kitchen: remove walls down to studs, rewire electrical to code, plumb to code, install new cabinets, appliances, sheetrock paint, trim (no structural)Details
remodel kitchen: remove walls down to studs, rewire electrical to code, plumb to code, install new cabinets, appliances, sheetrock paint, trim (no structural) | $47,718 |