Back to kitchen remodel contractors
Sunset Construction
- Based in
- Deser Hot Springs
- On San Francisco permits
- Apr 2019 to Nov 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2019 | Completed final sign-off Dec 2019 | 3609 Taraval St | install washer box with drain line and hot and cold water. install electric outlet in e closet. existing permit for kitchen remodel 201908128513Details
install washer box with drain line and hot and cold water. install electric outlet in e closet. existing permit for kitchen remodel 201908128513 | $1,200 |
| Aug 12, 2019 | Completed final sign-off Nov 2019 | 3609 Taraval St | replace cabinets, countertops, flooring, sink, add two electric plugs for countertops, new hood for range in existing kitchen. kitchen remodel.Details
replace cabinets, countertops, flooring, sink, add two electric plugs for countertops, new hood for range in existing kitchen. kitchen remodel. | $12,400 |