Sunny Ca International Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to Sep 2026
- Last 24 months
- 17 permits filed
24 permits since 2000: 11 completed, 9 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
10 kitchen remodel permits: 4 completed, 5 in progress, 1 never finaled. Typically 38 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | Completed final sign-off Sep 2026 | 1766 Quesada Av | retroactive permit for remodel of unit. kitchen & bathroom. for complaint# 200843170-a.Details
retroactive permit for remodel of unit. kitchen & bathroom. for complaint# 200843170-a. | $22,000 |
| Mar 12, 2026 | In progress issued Jun 2026 | 1290 Holloway Av | revision to pa # 202506309808: re-arrange kitchen & bathroom fixtures location at 2/f. re-arrange bathroom fixtures at g/f.Details
revision to pa # 202506309808: re-arrange kitchen & bathroom fixtures location at 2/f. re-arrange bathroom fixtures at g/f. | |
| Jan 21, 2026 | In progress issued May 2026 | 174 Farallones St | relocate (e) kitchen at second floor,construct (n) bedroom at second floor,construct adu at ground floor form prior approved floor plans,construct (n) deck at rear of houseDetails
relocate (e) kitchen at second floor,construct (n) bedroom at second floor,construct adu at ground floor form prior approved floor plans,construct (n) deck at rear of house | $50,000 |
| Dec 18, 2025 | In progress issued Apr 2026 | 1358 14th Av | 3rd floor-change layout, 1 new bathroom and laundry room, remodel 1 bathroom, 2nd floor-remove wall to make open kitchen, 1st fl- convert 535 sq ft space into 1 bedrm and 1 bathroom and 1 wine tasting rm. add roof deck expand (e) deck & add spiral stairs. new family room addition 144 sf ground flDetails
3rd floor-change layout, 1 new bathroom and laundry room, remodel 1 bathroom, 2nd floor-remove wall to make open kitchen, 1st fl- convert 535 sq ft space into 1 bedrm and 1 bathroom and 1 wine tasting rm. add roof deck expand (e) deck & add spiral stairs. new family room addition 144 sf ground fl | $200,000 |
| Jun 30, 2025 | In progress issued Jul 2025 | 1290 Holloway Av | comply w/ nov 202291106 & 202291059: remodel (e) kitchen, bathroom, add new bath & replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, full bath, powder room, family room, & wetbar at g/f.Details
comply w/ nov 202291106 & 202291059: remodel (e) kitchen, bathroom, add new bath & replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, full bath, powder room, family room, & wetbar at g/f. | $335,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 1229 45th Av | remodel 2 kitchens and 2 full bathrooms. remove all lath paster and install type x drywall. replace counter tops & cabinets, laminated floors, vanities, toliets, tubs.Details
remodel 2 kitchens and 2 full bathrooms. remove all lath paster and install type x drywall. replace counter tops & cabinets, laminated floors, vanities, toliets, tubs. | $50,000 |
| May 8, 2025 | Completed final sign-off Jun 2026 | 2501 26th Av | (1) kitchen and (1) full bathroom remodel in kind. replace all plaster with 5/8" type x drywall.Details
(1) kitchen and (1) full bathroom remodel in kind. replace all plaster with 5/8" type x drywall. | $35,000 |
| Oct 24, 2024 | Completed final sign-off Apr 2025 | 325 San Fernando Wy | revision to pa# 202403127647. replace stucco wall finish at south and north wall due to new shear walls. installation at 2/f. remove wall btw kitchen & dining, new island. change exteior side steps per plan.Details
revision to pa# 202403127647. replace stucco wall finish at south and north wall due to new shear walls. installation at 2/f. remove wall btw kitchen & dining, new island. change exteior side steps per plan. | $13,000 |
| Mar 12, 2024 | Completed final sign-off Apr 2025 | 325 San Fernando Wy | 1/f: excavate (e storage into (n) living space, including two bedrooms, two baths, (n) family and wet bar. 2/f: remodel () kitchen, (e) bath, add new bath, and new interior stair to 1/f. excavate both sides of side yardDetails
1/f: excavate (e storage into (n) living space, including two bedrooms, two baths, (n) family and wet bar. 2/f: remodel () kitchen, (e) bath, add new bath, and new interior stair to 1/f. excavate both sides of side yard | $280,000 |
| Mar 8, 2021 | Never finaled issued Oct 2021, no final | 558 17th Av | 1st fl: add 2 bedrooms, media room and full bath. 2nd fl: remodel kitchen, living room and bathroom. add 1 bedroom & full bath.Details
1st fl: add 2 bedrooms, media room and full bath. 2nd fl: remodel kitchen, living room and bathroom. add 1 bedroom & full bath. | $85,000 |