Back to kitchen remodel contractors
Sunlift Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jun 2018 to Dec 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 5 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2018 | Completed final sign-off Mar 2019 | 522 Mangels Av | revision to #201811145881. add 4 sun tubs in kitchen, hold back from property line min 3'-0". all work is non-structural - no framing changes.Details
revision to #201811145881. add 4 sun tubs in kitchen, hold back from property line min 3'-0". all work is non-structural - no framing changes. | $8,000 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 522 Mangels Av | kitchen remodel, like for like. install sink, update plumbing, all electrical outlets, install (4) recessed lights. bathroom remodel, like for like. install new sinkm toilet and new tub, (4) gfc, (3) canned lights , (1) xf.Details
kitchen remodel, like for like. install sink, update plumbing, all electrical outlets, install (4) recessed lights. bathroom remodel, like for like. install new sinkm toilet and new tub, (4) gfc, (3) canned lights , (1) xf. | |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 472 Dewey Bl | remodel kitchen and bathroom in kind. kitchen demo cabinets, sinks, flooring, install new cabinets and recessed lighting. all dedicaded appliances to be ggfi. remove tub, vanity and toilet, replace in kind.Details
remodel kitchen and bathroom in kind. kitchen demo cabinets, sinks, flooring, install new cabinets and recessed lighting. all dedicaded appliances to be ggfi. remove tub, vanity and toilet, replace in kind. | $20,000 |
| Jun 1, 2018 | Completed final sign-off Oct 2018 | 135 Faith St | remodel like for like bathroom: install new toilet, vanity, tub. same place. 2 canned lights, 1 gfci , in kitchen: install new cabinets, countertop, sink, faucet, 6 gfci, 7 canned lights, all like for like same place. no moving of walls or doors.Details
remodel like for like bathroom: install new toilet, vanity, tub. same place. 2 canned lights, 1 gfci , in kitchen: install new cabinets, countertop, sink, faucet, 6 gfci, 7 canned lights, all like for like same place. no moving of walls or doors. | $20,000 |