Back to kitchen remodel contractors
Summer Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Apr 2021
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 1030 Persia Av | remodel kitchen as replace cabinet. add (3) circuits for counter; remodel bathroom as replace bathtub. add 1 circuit for the dryer. no units to be moved/ no structural work. finishes/fixturesDetails
remodel kitchen as replace cabinet. add (3) circuits for counter; remodel bathroom as replace bathtub. add 1 circuit for the dryer. no units to be moved/ no structural work. finishes/fixtures | $8,000 |
| Jun 25, 2008 | Completed final sign-off Aug 2008 | 430 Arch St | kitchen & bathroom remodel. refinish hardwood floor, sliding door and rear windows at bedroom. .67 u factor max. work on 2/f.Details
kitchen & bathroom remodel. refinish hardwood floor, sliding door and rear windows at bedroom. .67 u factor max. work on 2/f. | $17,000 |
| May 5, 2006 | Completed final sign-off Feb 2007 | 2019 15th St | add 1 full bathroom & remodel existing kitchen & bath room on existing 2/f unit #2019 per plan.Details
add 1 full bathroom & remodel existing kitchen & bath room on existing 2/f unit #2019 per plan. | $18,000 |