Back to bathroom remodel contractors
Suad Karic Construction
- Based in
- Pleasanton
- On San Francisco permits
- Jun 2011 to Oct 2013
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 120 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2013 | Completed final sign-off Mar 2014 | 712 Bryant St | convert 1/2 bath into bar area and extend kitchen into pantry area. enclose dining area alcove for new office area. remove non bearing wall at 2nd fl bath, 2nd fl pantry. new led recess cans,new dedicated lines, plumb, remove toilet,sink, new bar sink. relocate 1 sprinkler, add 2 new. unit 5 only.Details
convert 1/2 bath into bar area and extend kitchen into pantry area. enclose dining area alcove for new office area. remove non bearing wall at 2nd fl bath, 2nd fl pantry. new led recess cans,new dedicated lines, plumb, remove toilet,sink, new bar sink. relocate 1 sprinkler, add 2 new. unit 5 only. | $74,000 |
| Jun 3, 2011 | Completed final sign-off Sep 2012 | 712 Bryant St | unit #5 only - remodel lower level interior includes demo of existing bath and construct new master bath, non structural interior walls to be removed or modified. new areas for laundry area and closets. build new platform at level of lowest stair. new plumbing,elec.Details
unit #5 only - remodel lower level interior includes demo of existing bath and construct new master bath, non structural interior walls to be removed or modified. new areas for laundry area and closets. build new platform at level of lowest stair. new plumbing,elec. | $120,000 |