Block 3760, lot 140
712 Bryant St
- City’s use
- Single Family Residential
- Built
- 2001
- Stories
- 4
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 2,097 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2013 | Completed final sign-off Dec 2013 | 712 Bryant St | International Fire Inc | move one extg sprinkler head and install 2 new sprinkler heads. ref app#201106037379Details
move one extg sprinkler head and install 2 new sprinkler heads. ref app#201106037379 | $3,000 |
| Oct 17, 2013 | Completed final sign-off Mar 2014 | 712 Bryant St | Suad Karic Construction | convert 1/2 bath into bar area and extend kitchen into pantry area. enclose dining area alcove for new office area. remove non bearing wall at 2nd fl bath, 2nd fl pantry. new led recess cans,new dedicated lines, plumb, remove toilet,sink, new bar sink. relocate 1 sprinkler, add 2 new. unit 5 only.Details
convert 1/2 bath into bar area and extend kitchen into pantry area. enclose dining area alcove for new office area. remove non bearing wall at 2nd fl bath, 2nd fl pantry. new led recess cans,new dedicated lines, plumb, remove toilet,sink, new bar sink. relocate 1 sprinkler, add 2 new. unit 5 only. | $74,000 |
| Sep 12, 2013 | Completed final sign-off Mar 2014 | 712 Bryant St | Suad Karic Construction | exploratory work. take off extg drywall 300 sq ft where is neccesssary to determen extg structural condition request by structural engineer for remodel 2nd floor. work consist of the unit #5 only.Details
exploratory work. take off extg drywall 300 sq ft where is neccesssary to determen extg structural condition request by structural engineer for remodel 2nd floor. work consist of the unit #5 only. | $1,000 |
| Mar 30, 2012 | Completed final sign-off Sep 2012 | 712 Bryant St | Suad Karic Construction | revision to app#201106037379 correction of notice. locate and expose all holdowns on the ground floor only for inspection. tighten extg holdowns, install new hdu 8 h.d. with new 4x6 post, epoxy anchor of hd20a in extg footing. replace exg 3x6 post with 4x6 post & tighten extg hd 10a,Details
revision to app#201106037379 correction of notice. locate and expose all holdowns on the ground floor only for inspection. tighten extg holdowns, install new hdu 8 h.d. with new 4x6 post, epoxy anchor of hd20a in extg footing. replace exg 3x6 post with 4x6 post & tighten extg hd 10a, | $37,070 |
| Jul 1, 2011 | Completed final sign-off Sep 2012 | 712 Bryant St | Suad Karic Construction | exploratory demo- take off drywall where is required by structural inc in 1st flr area, for future improvement workDetails
exploratory demo- take off drywall where is required by structural inc in 1st flr area, for future improvement work | $3,000 |
| Jun 3, 2011 | Completed final sign-off Sep 2012 | 712 Bryant St | Suad Karic Construction | unit #5 only - remodel lower level interior includes demo of existing bath and construct new master bath, non structural interior walls to be removed or modified. new areas for laundry area and closets. build new platform at level of lowest stair. new plumbing,elec.Details
unit #5 only - remodel lower level interior includes demo of existing bath and construct new master bath, non structural interior walls to be removed or modified. new areas for laundry area and closets. build new platform at level of lowest stair. new plumbing,elec. | $120,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Suad Karic Construction (5), International Fire Inc
- Engineers
- A Urrutia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.