Studio 101 General Building Contractor
- Based in
- Petaluma
- On San Francisco permits
- Dec 2018 to Mar 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 272 days from filing to permit and 989 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2020 | Completed final sign-off May 2024 | 433 Upper Tr | replace (e) wood shingls with new wood shingles in-like kind. replace (e) windows. new cantilever decks at rear facade on floors 1/2/3. new deck at rear, less than 10ft above grade. new safety rail at (e) roof.Details
replace (e) wood shingls with new wood shingles in-like kind. replace (e) windows. new cantilever decks at rear facade on floors 1/2/3. new deck at rear, less than 10ft above grade. new safety rail at (e) roof. | $328,000 |