Back to kitchen remodel contractors
Strong Tower Construction
- Based in
- Antioch
- On San Francisco permits
- May 2016 to May 2021
- Last 24 months
- 0 permits filed
10 permits since 2000: 8 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2020 | Never finaled issued Aug 2021, no final | 2182 Quesada Av | add new unit on 1st fl, new bedroom and bath addition (+388 sf). remodel e space with new kitchen and living space. no scope of work on 2nd flDetails
add new unit on 1st fl, new bedroom and bath addition (+388 sf). remodel e space with new kitchen and living space. no scope of work on 2nd fl | $160,000 |
| Apr 27, 2017 | Completed final sign-off Oct 2017 | 3833 24th St | rewire complete from panel, add sub panel in unit. remodel bathroom and kitchen. add ceiling lights. replace damaged sheetrock and any damaged wood to structure if any. replace water heater to tankless.Details
rewire complete from panel, add sub panel in unit. remodel bathroom and kitchen. add ceiling lights. replace damaged sheetrock and any damaged wood to structure if any. replace water heater to tankless. | $25,000 |
| Apr 27, 2017 | Completed final sign-off Mar 2018 | 3835 24th St | rewire complete from panel, add sub panel in unit. remodel bathroom and kitchen. add ceiling lights. replace damaged sheetrock and any damaged wood to structure if any. replace water heater to tankless.Details
rewire complete from panel, add sub panel in unit. remodel bathroom and kitchen. add ceiling lights. replace damaged sheetrock and any damaged wood to structure if any. replace water heater to tankless. | $25,000 |
| Aug 17, 2016 | Completed final sign-off Mar 2018 | 1631 Shafter Av | add 1 dwelling unit at 1/f -reconfigure 1st floor plan, new kitchen on 1st floorDetails
add 1 dwelling unit at 1/f -reconfigure 1st floor plan, new kitchen on 1st floor | $5,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 3831 24th St | kitchen and bathroom remodel; electrical update. everything is same location (new owner for condo)Details
kitchen and bathroom remodel; electrical update. everything is same location (new owner for condo) | $20,000 |