Strictly Customs Remodeling

Contractor license
899786
State license record
Based in
San Francisco
On San Francisco permits
Jul 2007 to Sep 2008
Last 24 months
0 permits filed

9 permits since 2000: 5 completed, 4 never finaled.

Of the 4 never-finaled permits, 4 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllKitchen remodel 2Bathroom remodel 3
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 9, 2008Completed
final sign-off Aug 2009
394 Teddy Avto continue & complete work started under pa#200705070583 .
Details
Permit
200809091062
Status
complete
Filed
Sep 9, 2008
Permit issued
Sep 9, 2008
Final sign-off
Aug 25, 2009
Declared cost
$45,000
Address
394 Teddy Av

to continue & complete work started under pa#200705070583 .

Open the permit page

$45,000
Jan 3, 2008Completed
final sign-off May 2008
1210 12th Avunit #4: bathroom remodeling on second floor. existing plumbing fixtures replacement in same locations. new door instalation. electrical under separate permit.
Details
Permit
200801031760
Status
complete
Filed
Jan 3, 2008
Permit issued
Feb 11, 2008
Final sign-off
May 21, 2008
Declared cost
$12,000
Address
1210 12th Av

unit #4: bathroom remodeling on second floor. existing plumbing fixtures replacement in same locations. new door instalation. electrical under separate permit.

Open the permit page

$12,000
Dec 3, 2007Completed
final sign-off Feb 2008
1337 Natoma Stadd hallway to existing bedroom of unit 1, 2nd floor. move electrical panel to new wall and new lightings, revision to pa# 2001.12.195628
Details
Permit
200712039464
Status
complete
Filed
Dec 3, 2007
Permit issued
Dec 3, 2007
Final sign-off
Feb 4, 2008
Declared cost
$8,000
Address
1337 Natoma St

add hallway to existing bedroom of unit 1, 2nd floor. move electrical panel to new wall and new lightings, revision to pa# 2001.12.195628

Open the permit page

$8,000
Nov 16, 2007Never finaled
issued Nov 2007, no final
5539 Anza Streplace old tub w/ new jacuzzi tub rewire for jacuzzi tub.
Details
Permit
200711168397
Status
issued
Filed
Nov 16, 2007
Permit issued
Nov 16, 2007
Declared cost
$8,000
Address
5539 Anza St

replace old tub w/ new jacuzzi tub rewire for jacuzzi tub.

Open the permit page

$8,000
Oct 29, 2007Never finaled
issued Oct 2007, no final
1260 Clay Stinterior wall openings in the bedroom. remove and replace inkind dry wall at 2nd floor unit 204
Details
Permit
200710296727
Status
issued
Filed
Oct 29, 2007
Permit issued
Oct 29, 2007
Declared cost
$300
Address
1260 Clay St

interior wall openings in the bedroom. remove and replace inkind dry wall at 2nd floor unit 204

Open the permit page

$300
Oct 18, 2007Never finaled
issued Oct 2007, no final
410 Waller Streplace cabinets with new approximate 11 cabinets and add 6 can lights. 50% wattage fluorescent lighting.
Details
Permit
200710185768
Status
issued
Filed
Oct 18, 2007
Permit issued
Oct 18, 2007
Declared cost
$18,000
Address
410 Waller St

replace cabinets with new approximate 11 cabinets and add 6 can lights. 50% wattage fluorescent lighting.

Open the permit page

$18,000
Aug 1, 2007Completed
final sign-off Aug 2008
1260 Clay Stunit #204-comply w/ nov 200710751. bathroom- new tub, rewiring, new floor (tile). kitchen- new cabinets, panel relocation, can lights. new plumbing for sink and faucet. bathroom lighting to be controlled by occupant sensor. kitchen 50% fluorescent light.
Details
Permit
200708018449
Status
complete
Filed
Aug 1, 2007
Permit issued
Aug 1, 2007
Final sign-off
Aug 1, 2008
Declared cost
$28,000
Address
1260 Clay St

unit #204-comply w/ nov 200710751. bathroom- new tub, rewiring, new floor (tile). kitchen- new cabinets, panel relocation, can lights. new plumbing for sink and faucet. bathroom lighting to be controlled by occupant sensor. kitchen 50% fluorescent light.

Open the permit page

$28,000
Jul 26, 2007Completed
final sign-off Aug 2012
1267 Oak Streplace 9 kitchen cabinets with new. 10% lighting will be fluorescent.
Details
Permit
200707267795
Status
complete
Filed
Jul 26, 2007
Permit issued
Jul 26, 2007
Final sign-off
Aug 20, 2012
Declared cost
$10,000
Address
1267 Oak St

replace 9 kitchen cabinets with new. 10% lighting will be fluorescent.

Open the permit page

$10,000
Jul 23, 2007Never finaled
issued Jul 2007, no final
118 Milton Stupdating bathroom with new tub, tile, floor, sink cabinets. lighting to be controlled by occupancy sensor.
Details
Permit
200707237445
Status
issued
Filed
Jul 23, 2007
Permit issued
Jul 23, 2007
Declared cost
$8,500
Address
118 Milton St

updating bathroom with new tub, tile, floor, sink cabinets. lighting to be controlled by occupancy sensor.

Open the permit page

$8,500