Block 0214, lot 054
1260 Clay St
- City’s use
- Single Family Residential
- Built
- 1950
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 575 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2017 | Completed final sign-off Apr 2017 | 1260 Clay St | Blue Mountain Construction Services Inc | remove trim around window perform flashing repairs replace trim to match existing visible to street.Details
remove trim around window perform flashing repairs replace trim to match existing visible to street. | $3,200 |
| Apr 24, 2013 | Never finaled issued Apr 2013, no final | 1260 Clay St | Lyon Restoration Inc Dba Service Team Of | unit # 204: replacing damaged dry wall and plaster in wall and ceiling due to water damage in kind.Details
unit # 204: replacing damaged dry wall and plaster in wall and ceiling due to water damage in kind. | $7,885 |
| Nov 5, 2012 | Completed final sign-off Dec 2012 | 1260 Clay St | Progress Construction | reset bathroom toilet & sink, replace insulation , drywall, furring strips, & soundboards, replace switches & outlets, & paintDetails
reset bathroom toilet & sink, replace insulation , drywall, furring strips, & soundboards, replace switches & outlets, & paint | $8,000 |
| Oct 29, 2007 | Never finaled issued Oct 2007, no final | 1260 Clay St | Strictly Customs Remodeling | interior wall openings in the bedroom. remove and replace inkind dry wall at 2nd floor unit 204Details
interior wall openings in the bedroom. remove and replace inkind dry wall at 2nd floor unit 204 | $300 |
| Aug 1, 2007 | Completed final sign-off Aug 2008 | 1260 Clay St | Strictly Customs Remodeling | unit #204-comply w/ nov 200710751. bathroom- new tub, rewiring, new floor (tile). kitchen- new cabinets, panel relocation, can lights. new plumbing for sink and faucet. bathroom lighting to be controlled by occupant sensor. kitchen 50% fluorescent light.Details
unit #204-comply w/ nov 200710751. bathroom- new tub, rewiring, new floor (tile). kitchen- new cabinets, panel relocation, can lights. new plumbing for sink and faucet. bathroom lighting to be controlled by occupant sensor. kitchen 50% fluorescent light. | $28,000 |
| Jul 18, 2007 | Never finaled issued Jul 2007, no final | 1260 Clay St | Ideal Drying Inc. | due to mold damage, remove & dispose approx. 350 sq.ft. of drywall from master bathDetails
due to mold damage, remove & dispose approx. 350 sq.ft. of drywall from master bath | $3,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 1260 Clay St | Britannia Construction, Inc. | work @ unit# 204 only. repair plaster & insulation in living room in kind. no structural change. 400 sq. ft.Details
work @ unit# 204 only. repair plaster & insulation in living room in kind. no structural change. 400 sq. ft. | $6,000 |
| Apr 10, 2007 | Never finaled issued Apr 2007, no final | 1260 Clay St | street space permitDetails
street space permit | ||
| Mar 9, 2007 | Never finaled issued Mar 2007, no final | 1260 Clay St | street spaceDetails
street space | ||
| Feb 23, 2007 | Completed final sign-off Apr 2007 | 1260 Clay St | Saarman Construction,Ltd. | remove e wood fascia and rim joist from east,south,west edges of eyebrow. demo e stucco siffit on westside of eyebrow. retain e metal pain flashing. install n 2 x rim joist exposed face wrapped with self adhesive membrane. install n redwood fascia and 1x battens to match e. paint n fascia to match.Details
remove e wood fascia and rim joist from east,south,west edges of eyebrow. demo e stucco siffit on westside of eyebrow. retain e metal pain flashing. install n 2 x rim joist exposed face wrapped with self adhesive membrane. install n redwood fascia and 1x battens to match e. paint n fascia to match. | $4,900 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Strictly Customs Remodeling (2), Blue Mountain Construction Services Inc, Britannia Construction, Inc., Ideal Drying Inc., Lyon Restoration Inc Dba Service Team Of, Progress Construction, Saarman Construction,Ltd.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.