Back to kitchen remodel contractors
Straightedge Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 37 completed, 2 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 10 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2023 | Never finaled issued Jun 2023, no final | 894 Union St | remodel (e) kitchen and two bathrooms. replace all knob and tube wiring. add insulation, new tile plumbing fixtures, new cabinets.Details
remodel (e) kitchen and two bathrooms. replace all knob and tube wiring. add insulation, new tile plumbing fixtures, new cabinets. | $20,000 |
| Jun 6, 2023 | Never finaled issued Jun 2023, no final | 896 Union St | remodel existing 2 bath and 1 kitchen. upgrade knob and tube wiring. upgrade plumbing to code. bathrooms: replace finishes, fixtures, and vanities in-kind. kitchen: replace cabinets, countertops, and applicances in-kind.Details
remodel existing 2 bath and 1 kitchen. upgrade knob and tube wiring. upgrade plumbing to code. bathrooms: replace finishes, fixtures, and vanities in-kind. kitchen: replace cabinets, countertops, and applicances in-kind. | $16,000 |
| Dec 6, 2021 | Completed final sign-off Jul 2023 | 1742 Filbert St | remove wall between kitchen and dining room on 2nd, 3rd & 4th floors. add new bath on 2nd, 3rd & 4th floors.Details
remove wall between kitchen and dining room on 2nd, 3rd & 4th floors. add new bath on 2nd, 3rd & 4th floors. | $30,000 |
| Jun 1, 2021 | Never finaled issued Jun 2021, no final | 658 Wisconsin St | renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade.Details
renovate (e) kitchen with new applianeces, plumbing & light fixtures. new floor and wall surfaces. new window in rear facade. | $15,000 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 3525 Cabrillo St | replacing e kitchen cabinets, countertop. update eletrical & plumbingDetails
replacing e kitchen cabinets, countertop. update eletrical & plumbing | $4,000 |
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 660 Wisconsin St | upper unit - new kitchen cabinets, update elect. & plumbing in kitchen only, new drywall , insulation where neededDetails
upper unit - new kitchen cabinets, update elect. & plumbing in kitchen only, new drywall , insulation where needed | $25,000 |
| Mar 8, 2017 | Completed final sign-off Mar 2018 | 222 Tingley St | addition of ground story @ rear, addition on 2nd story @ rear. (n) bath, relocated kitchen & staircaseDetails
addition of ground story @ rear, addition on 2nd story @ rear. (n) bath, relocated kitchen & staircase | $60,000 |
| Dec 12, 2016 | Completed final sign-off Nov 2017 | 1750 Taylor St | #2002 - remodel (e) single family condo including new kitchen, bathrooms, bedrooms and living area. replace (e) all (e) glazing, new fau w/air conditioning, no change in e unit size, glazing. replaced in kind. ref pa 201607192679Details
#2002 - remodel (e) single family condo including new kitchen, bathrooms, bedrooms and living area. replace (e) all (e) glazing, new fau w/air conditioning, no change in e unit size, glazing. replaced in kind. ref pa 201607192679 | $225,000 |
| Oct 31, 2016 | Completed final sign-off May 2017 | 2225 Pacific Av | removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinishDetails
removal of wall in dining rm grnd flr. widening of wall openings in kitchen - grnd & middle flrs. remodel of 2 kitchens, 2 master bathrooms. relocate of hot water heaters (2) & 2 furnaces. overall paint and floor refinish | $90,000 |
| Nov 21, 2014 | Never finaled issued Nov 2014, no final | 222 Tingley St | bathroom remodel, kitchen remodel, new cabinet, new countertop, new electrical (bath) new tile, new fixtures, new plumbing. no wall modification, no structural.Details
bathroom remodel, kitchen remodel, new cabinet, new countertop, new electrical (bath) new tile, new fixtures, new plumbing. no wall modification, no structural. | $15,000 |
| Sep 25, 2014 | Completed final sign-off Apr 2015 | 327 Staples Av | roof deck over the existing 1st floor kitchen roof, 188 sfDetails
roof deck over the existing 1st floor kitchen roof, 188 sf | $20,000 |
| Jul 22, 2014 | Completed final sign-off Feb 2015 | 542 03rd Av | interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind.Details
interior alteration only 2 full bath remodel on the third floor. one new half bath on 2nd floor and kitchen remodel. new windows on 2nd and 3rd floor not visible from street to be replaced in kind. | $96,500 |
| Feb 7, 2014 | Expired or cancelled expired May 2017 | 625 47th Av | remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing.Details
remodel 3 bthrooms & kitchen, new windows, demo interior walls, new roof deck, new electrical new plumbing. | $150,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 758 Haight St | work in unit #3: demo kitchen and bathroom, new cabinets fixtures, update electrical and plumbing. lighting to comply with cec 150 (k)Details
work in unit #3: demo kitchen and bathroom, new cabinets fixtures, update electrical and plumbing. lighting to comply with cec 150 (k) | $50,000 |
| Sep 27, 2013 | Completed final sign-off Dec 2013 | 741 North Point St | demo existing kitchen & bathroom. new tile, cabinets minor plumbing & electrical. at front building top unit. lighting to comply with cec 150(k)Details
demo existing kitchen & bathroom. new tile, cabinets minor plumbing & electrical. at front building top unit. lighting to comply with cec 150(k) | $20,000 |
| Jun 26, 2012 | Completed final sign-off Dec 2013 | 1083 Clay St | extend kitchen, new counter tops, back splash (no removal or addition of partitions) cabinets - finishes only some minor electrical + plumbing.Details
extend kitchen, new counter tops, back splash (no removal or addition of partitions) cabinets - finishes only some minor electrical + plumbing. | $14,000 |