Back to kitchen remodel contractors
Stewart Mcalvain Const.Dba Landmark -B
- Based in
- Novato
- On San Francisco permits
- Aug 2000 to Aug 2021
- Last 24 months
- 0 permits filed
34 permits since 2000: 28 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 223 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2021 | Completed final sign-off Mar 2023 | 787 Clayton St | unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings.Details
unit 4: remodel kitchen and bathroom, entry closet. replace rear facing windows with energy efficient windows. no change to (e) openings. | $24,000 |
| Nov 24, 2014 | Completed final sign-off Apr 2015 | 2639 23rd Av | kitchen and bath remodel; to comply with cec150.0(k) 3 & 5Details
kitchen and bath remodel; to comply with cec150.0(k) 3 & 5 | $30,000 |
| Nov 24, 2014 | Completed final sign-off Apr 2015 | 600 Niagara Av | misc. dry rot repair at front window and stair less than 50%; kitchen and bath remodel to comply with cec150.0(k)3 & 5Details
misc. dry rot repair at front window and stair less than 50%; kitchen and bath remodel to comply with cec150.0(k)3 & 5 | $32,000 |
| Jul 27, 2011 | Completed final sign-off Mar 2012 | 55 Melrose Av | fire damage-repair in kind per nov# 201150126, demo fire damaged & smoke damaged finishes, hardwood floor, gypsum, wall board, tile, roofing & appliances in living room, bathroom, kitchen & bedrm. repair 60 sq ft floor joist & roof rafter in living roomDetails
fire damage-repair in kind per nov# 201150126, demo fire damaged & smoke damaged finishes, hardwood floor, gypsum, wall board, tile, roofing & appliances in living room, bathroom, kitchen & bedrm. repair 60 sq ft floor joist & roof rafter in living room | $50,000 |
| Feb 25, 2010 | Completed final sign-off May 2012 | 537 Belvedere St | rear addition, new roof dormers, new deck. raise building 24". new garage and driveway, renovate kitchen, family room, master bedroom, bathrooms, stairs. add 1 full bath & 1 master bath,1 half bath.Details
rear addition, new roof dormers, new deck. raise building 24". new garage and driveway, renovate kitchen, family room, master bedroom, bathrooms, stairs. add 1 full bath & 1 master bath,1 half bath. | $400,000 |