Back to kitchen remodel contractors
Steven S Donaldson
- Based in
- San Anselmo
- On San Francisco permits
- Nov 2001 to Oct 2017
- Last 24 months
- 0 permits filed
28 permits since 2000: 20 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2010 | Completed final sign-off Feb 2011 | 1320 Leavenworth St | replace 3 front windows from wood sash (rotted) to wood replacement windows. u factor 0.40 max. replace kitchen & bedroom wood sash windows with vinyl replacement. no stucco work, etc. no structural & no egress window changes.Details
replace 3 front windows from wood sash (rotted) to wood replacement windows. u factor 0.40 max. replace kitchen & bedroom wood sash windows with vinyl replacement. no stucco work, etc. no structural & no egress window changes. | $4,000 |
| Jan 15, 2010 | Completed final sign-off Mar 2011 | 1320 Leavenworth St | remove lath & plaster & replace w/drywall, replaxe knob & tube, electrical, replace galvanized water supplies w/copper, replace heater w/forced air, new water heater, new kitchen cabinet & fixtures, new bathroom fixtures.Details
remove lath & plaster & replace w/drywall, replaxe knob & tube, electrical, replace galvanized water supplies w/copper, replace heater w/forced air, new water heater, new kitchen cabinet & fixtures, new bathroom fixtures. | $50,000 |
| Mar 26, 2009 | Completed final sign-off May 2009 | 531 47th Av | install new kitchen cabinets and counter, replace (e) window, new electrical circuits for kitchen & lighting, new drywall associated with kitchen work. new flooring, sink at (e) locationDetails
install new kitchen cabinets and counter, replace (e) window, new electrical circuits for kitchen & lighting, new drywall associated with kitchen work. new flooring, sink at (e) location | $20,000 |