Sterling Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Aug 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2011 | Completed final sign-off Mar 2012 | 1490 32nd Av | exterior stair entry removal, repair membrane, replace existing exterior courtyard removal, repair membrane, stucco, replace as existing. revision to 201103172276Details
exterior stair entry removal, repair membrane, replace existing exterior courtyard removal, repair membrane, stucco, replace as existing. revision to 201103172276 | $12,000 |
| Jun 1, 2011 | Completed final sign-off May 2012 | 1482 32nd Av | interior remodel of 2 stories residence. partial reclamation of garage space and upstairs central courtyard, new interior stair, new forced air heating system. replacement of bathroom fixtures and finishes. new skylight over stairs.Details
interior remodel of 2 stories residence. partial reclamation of garage space and upstairs central courtyard, new interior stair, new forced air heating system. replacement of bathroom fixtures and finishes. new skylight over stairs. | $175,000 |