Stephenson Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Apr 2012 to Nov 2016
- Last 24 months
- 0 permits filed
38 permits since 2000: 27 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 45 days from filing to permit and 535 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 10, 2013 | Completed final sign-off Jul 2013 | 1100 Sacramento St | #1008 - revision to appl #2012.09.04.8879 - change guardrail at stair from 42" above nose of tread to 36".Details
#1008 - revision to appl #2012.09.04.8879 - change guardrail at stair from 42" above nose of tread to 36". | |
| Sep 4, 2012 | Completed final sign-off Apr 2014 | 1100 Sacramento St | 10th floor unit #1008 - revision to appl #2012.0416.8335 - remvoe additoinal non-bearing walls, omit half bath, revise guardrail at stair, revise guardrail at 11th floor, revise bracing at chimneys, structural upgrade at portion of living room ceiling.Details
10th floor unit #1008 - revision to appl #2012.0416.8335 - remvoe additoinal non-bearing walls, omit half bath, revise guardrail at stair, revise guardrail at 11th floor, revise bracing at chimneys, structural upgrade at portion of living room ceiling. | |
| Apr 16, 2012 | Completed final sign-off Apr 2014 | 1100 Sacramento St | 10th fl/unit #1008-interior remodel of apt unit including kitchen remodel, bathroom remodel, new stairs (interior). replace (e) windows at (e) locationsDetails
10th fl/unit #1008-interior remodel of apt unit including kitchen remodel, bathroom remodel, new stairs (interior). replace (e) windows at (e) locations | $150,000 |