Stephen Murphy Construction
- Based in
- Brisbane
- On San Francisco permits
- Jul 2015 to Apr 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 never finaled. Typically 439 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2021 | Never finaled issued Apr 2022, no final | 49 Bessie St | remodel of (e) single family dwelling including one bedroom, living room, kitchen, and toilet on level 1. conversion of an unoccupied lower level to two bedrooms, common room, and storage. replace dry rotted roof deck in back with new wood structure on (e) footprint - no change in dimensionsDetails
remodel of (e) single family dwelling including one bedroom, living room, kitchen, and toilet on level 1. conversion of an unoccupied lower level to two bedrooms, common room, and storage. replace dry rotted roof deck in back with new wood structure on (e) footprint - no change in dimensions | $300,000 |