Back to kitchen remodel contractors
Stellar Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Mar 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 15 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2018 | Completed final sign-off Oct 2018 | 2341 Franklin St | unit#2 revision to 201802151399 additional work - move kitchen into living rm, convert (e) kitchen to bedroom with laundry closet and clothing closet. remove wall in btwn (e) wlk in lcoset and living rm to accomodate (n) kitchen.Details
unit#2 revision to 201802151399 additional work - move kitchen into living rm, convert (e) kitchen to bedroom with laundry closet and clothing closet. remove wall in btwn (e) wlk in lcoset and living rm to accomodate (n) kitchen. | $22,000 |
| Feb 15, 2018 | Completed final sign-off Oct 2018 | 2341 Franklin St | kitchen remodel: remove (e) cabinets, install new w/new countertopsDetails
kitchen remodel: remove (e) cabinets, install new w/new countertops | $18,000 |
| Nov 27, 2012 | Completed final sign-off Apr 2013 | 2026 12th Av | demo existing kitchen, install new cabinets, countertops, backsplash, install smaller recess lights where existing ones are & update the electrical to code if needed. also change out window in kitchenDetails
demo existing kitchen, install new cabinets, countertops, backsplash, install smaller recess lights where existing ones are & update the electrical to code if needed. also change out window in kitchen | $20,000 |
| Jun 21, 2012 | Completed final sign-off Aug 2012 | 830 De Haro St | kitchen update. install new granite or engineered countertops, change all outlets in kitche to gfcis above countertops. tile kitchen floor. pull new gas line for range. tile backsplash in kitchen. new faucet in kitchen. new plasma tv bracket above mantel in linving room and recess in wall with outleDetails
kitchen update. install new granite or engineered countertops, change all outlets in kitche to gfcis above countertops. tile kitchen floor. pull new gas line for range. tile backsplash in kitchen. new faucet in kitchen. new plasma tv bracket above mantel in linving room and recess in wall with outle | $15,000 |
| Aug 12, 2008 | Completed final sign-off Oct 2008 | 930 Kirkham St | kitchen remodel - replace cabinets, change electrical, plumbing, tile.Details
kitchen remodel - replace cabinets, change electrical, plumbing, tile. | $10,000 |