Steadfast Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Dec 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 9 days from filing to permit and 333 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2019 | Completed final sign-off May 2020 | 1386 10th Av | remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50%Details
remodel of (e) 1st flr - bathrm, ofc & den in kind. 2nd flr - kitchen, open wall to (e) medica rm. replace windows at rear ext wall. repair (e) dryrot deck and ext stair less than 50% | $105,000 |