Back to bathroom remodel contractors
Steadfast Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Dec 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 5 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 249 Peru Av | remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors.Details
remove rear portion of the building, excavate crawl space and grade at rear yard to create new basement, new interior stairs connecting 1st floor with basement; horizontal addition at rear yard for 1st floor and basement, relocate kitchen and bathroom in first floor; new window and exterior doors. | $250,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2022 | 1479 05th Av | bathroom remodel in kind. one sink, shower, bathtub, new electrical, tile.Details
bathroom remodel in kind. one sink, shower, bathtub, new electrical, tile. | $12,500 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 215 Arkansas St | in kind bathroom remodeling and change kichen cabinets and new countertop. bathroom 62 sq ft, kitchen 160 sq ft.Details
in kind bathroom remodeling and change kichen cabinets and new countertop. bathroom 62 sq ft, kitchen 160 sq ft. | $20,000 |