Back to kitchen remodel contractors
Start Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Jun 2016
- Last 24 months
- 0 permits filed
20 permits since 2000: 18 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2015 | Completed final sign-off Apr 2016 | 1336 34th Av | remodel and relocate kitchen, infill center patio, add media room and office on 2nd floor.Details
remodel and relocate kitchen, infill center patio, add media room and office on 2nd floor. | $30,000 |
| Nov 13, 2013 | Completed final sign-off Sep 2014 | 226 Hearst Av | interior remodel. add two (2) dormer skylights. remove fireplace on 1st fl. convert fireplace to a gas, reconfigure (e) living area for better circulation. new floor layout includes 2 bedrooms, kitchen, living & dining room on 2nd fl. 2 new skylights;(n) furnace + (n) water heateDetails
interior remodel. add two (2) dormer skylights. remove fireplace on 1st fl. convert fireplace to a gas, reconfigure (e) living area for better circulation. new floor layout includes 2 bedrooms, kitchen, living & dining room on 2nd fl. 2 new skylights;(n) furnace + (n) water heate | $62,000 |
| Feb 8, 2013 | Completed final sign-off May 2013 | 1401 41st Av | per inspectors request to legalize previously remodeled kitchens for both units. no walls added or movedDetails
per inspectors request to legalize previously remodeled kitchens for both units. no walls added or moved | $26,000 |
| May 11, 2012 | Completed final sign-off Sep 2012 | 1219 39th Av | revision to 201112201403. remodel e kitchen, e bath, e bedroom, new study room on 2nd fl. electrical and plumbing under separate permit. new bath, den, storage on gr flDetails
revision to 201112201403. remodel e kitchen, e bath, e bedroom, new study room on 2nd fl. electrical and plumbing under separate permit. new bath, den, storage on gr fl | $35,000 |
| Jul 28, 2009 | Completed final sign-off Dec 2009 | 49 Godeus St | comply with notice 200811136483 (correction notice). remodel 2 kitchens and 3 bathrooms, new electrical wiring, new plumbing, 3 new electrical service. fan forced gas heating system.Details
comply with notice 200811136483 (correction notice). remodel 2 kitchens and 3 bathrooms, new electrical wiring, new plumbing, 3 new electrical service. fan forced gas heating system. | $56,000 |
| Dec 5, 2008 | Never finaled issued Dec 2008, no final | 1419 34th Av | comply w/n.o.v. #20881338 & revise pa #200810103915 at (e) 2nd floor plan showing (e) wall to be removed between (e) kitchen & dining roomDetails
comply w/n.o.v. #20881338 & revise pa #200810103915 at (e) 2nd floor plan showing (e) wall to be removed between (e) kitchen & dining room | |
| Nov 13, 2008 | Expired or cancelled expired Dec 2009 | 49 Godeus St | bath/kitchen remodeling -deck repair less than 50% deck size 4x6. new linoleum. to comply with nov#200876693. no lighting change.Details
bath/kitchen remodeling -deck repair less than 50% deck size 4x6. new linoleum. to comply with nov#200876693. no lighting change. | $30,000 |
| Oct 10, 2008 | Completed final sign-off Mar 2009 | 2233 Santiago St | 1)remove extg bedroom, construct 2 new bedrooms, 2 new bath rooms, one storage room and laundry room on ground floor.2)relocate extg kitchen, consturct new study room ann remodel extg bath room on 2nd floor. add 2 new skylights. 3) infill (e) lightwell.Details
1)remove extg bedroom, construct 2 new bedrooms, 2 new bath rooms, one storage room and laundry room on ground floor.2)relocate extg kitchen, consturct new study room ann remodel extg bath room on 2nd floor. add 2 new skylights. 3) infill (e) lightwell. | $60,000 |
| Oct 10, 2008 | Completed final sign-off Mar 2009 | 1419 34th Av | 1)construct one new bedroom, 2 new bath rooms, and family room on ground floor. 2)remodel extg kitchen and extg bath on 2nd floor.3)construct new deck at rear yardDetails
1)construct one new bedroom, 2 new bath rooms, and family room on ground floor. 2)remodel extg kitchen and extg bath on 2nd floor.3)construct new deck at rear yard | $60,000 |