Starlite Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Jul 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 15 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 2 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2016 | Completed final sign-off Jan 2017 | 2043 Palou Av | 1st flr: add 1 half bath, 1 full bath, 2 bedrooms, 1 family room. infill at rear. 2nd flr: remodel kitchen and bathroom. add stairs to yard and replace fron 2 aluminum windows in kindDetails
1st flr: add 1 half bath, 1 full bath, 2 bedrooms, 1 family room. infill at rear. 2nd flr: remodel kitchen and bathroom. add stairs to yard and replace fron 2 aluminum windows in kind | $90,000 |
| Jan 26, 2012 | Completed final sign-off Sep 2012 | 39 Curtis St | install 1 hour rated wall to seperate the proposed bedroom, 1 family room, 1 bath room with shower. 2)remodel upper floor to re-locate and remodel extg kitchen, add full bath room for master bedroom. 3)install a deck and stair for the upper floor.Details
install 1 hour rated wall to seperate the proposed bedroom, 1 family room, 1 bath room with shower. 2)remodel upper floor to re-locate and remodel extg kitchen, add full bath room for master bedroom. 3)install a deck and stair for the upper floor. | $28,000 |