Back to kitchen remodel contractors
Stamatis Construction
- Based in
- So San Francisco
- On San Francisco permits
- Jan 2001 to Sep 2021
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 412 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2021 | Completed final sign-off Nov 2022 | 2311 17th Av | kitchen remodel: remove interior non-load bearing wall,relocate 2 door ways, replace 3 non-visble to public windows, install fiber cement lap siding, insulate exterior wall/ceiling. raise ceiling joists 6".install sub-panel, update electrical circuits,replace drywall,cabinets, countertops & flooringDetails
kitchen remodel: remove interior non-load bearing wall,relocate 2 door ways, replace 3 non-visble to public windows, install fiber cement lap siding, insulate exterior wall/ceiling. raise ceiling joists 6".install sub-panel, update electrical circuits,replace drywall,cabinets, countertops & flooring | $54,000 |