Stallion Construction

Contractor license
657102
State license record
Based in
Meadow Vista
On San Francisco permits
Jan 2010 to Jun 2010
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllStairs 1Kitchen remodel 1Bathroom remodel 1

1 kitchen remodel permit: 1 completed. Typically 90 days from filing to permit and 257 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 8, 2010Completed
final sign-off Dec 2010
4447 23rd Stbuild new stairs connecting 2 stories at lower unit. replace (1) pane window with 2 pane in (e) openings. relcoate basement bath. remodel (2) kitchens & 2 (baths). install new sgd in (e) opening back 2nd floor.
Details
Permit
201001084449
Status
complete
Filed
Jan 8, 2010
Permit issued
Apr 8, 2010
Final sign-off
Dec 21, 2010
Declared cost
$100,000
Address
4447 23rd St

build new stairs connecting 2 stories at lower unit. replace (1) pane window with 2 pane in (e) openings. relcoate basement bath. remodel (2) kitchens & 2 (baths). install new sgd in (e) opening back 2nd floor.

Open the permit page

$100,000