Back to kitchen remodel contractors
Spotlight Construction Groups Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2001 to Jun 2026
- Last 24 months
- 13 permits filed
132 permits since 2000: 108 completed, 4 in progress, 16 never finaled, 4 expired or cancelled.
Of the 16 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
36 kitchen remodel permits: 30 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 226 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Jun 2026 | 322 Princeton St | kitchen remodel like for like, update electrical and plumbing. replace 2 windows street facing and 4 windows in the back of home.Details
kitchen remodel like for like, update electrical and plumbing. replace 2 windows street facing and 4 windows in the back of home. | $50,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 2837 Santiago St | remodel of (e) family room on 1st fl. add bedroom, bathroom, kitchenette, walk in closet and laundry closetDetails
remodel of (e) family room on 1st fl. add bedroom, bathroom, kitchenette, walk in closet and laundry closet | $40,000 |
| Jul 3, 2025 | Completed final sign-off Sep 2025 | 270 Arleta Av | remodel existing kitchen in kind.Details
remodel existing kitchen in kind. | $28,000 |
| Nov 4, 2024 | Completed final sign-off Mar 2025 | 1306 Plymouth Av | remodel of existing kitchen (interior work only) in like kindDetails
remodel of existing kitchen (interior work only) in like kind | $36,000 |
| Jul 23, 2024 | Completed final sign-off Apr 2025 | 172 Los Palmos Dr | revision to pa#202402135851: 1) first floor new closet. 2) second floor: remove ext wall between extg living room and extg kitchen. 3)2nd floor: new bathroom and closets. 4)delete new skylight.Details
revision to pa#202402135851: 1) first floor new closet. 2) second floor: remove ext wall between extg living room and extg kitchen. 3)2nd floor: new bathroom and closets. 4)delete new skylight. | $5,000 |
| Feb 22, 2024 | Completed final sign-off Dec 2024 | 164 Marietta Dr | install (n) skylight @ master bedroom and (1) window at rear of house at kitchen . u factor .3Details
install (n) skylight @ master bedroom and (1) window at rear of house at kitchen . u factor .3 | $4,000 |
| Feb 13, 2024 | Completed final sign-off Apr 2025 | 172 Los Palmos Dr | 1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof.Details
1/f:replace laundry,n bathroom, bedroom, media room. 2/f: remodel kitchen and bathroom, new bathroom, demo fireplace - remove all sheetrock and replce with (n) 5/8in gyp type-x board, (n) 2x2 skylight on flatroof. | $180,000 |
| Nov 6, 2023 | Completed final sign-off Oct 2024 | 740 Cayuga Av | remodel (e) kitchen and bathroom. remove the (e) wall between kitchen and dinning room.Details
remodel (e) kitchen and bathroom. remove the (e) wall between kitchen and dinning room. | $70,000 |
| Oct 30, 2023 | Completed final sign-off Feb 2024 | 1570 Clay St | remodel bathroom and kitchen in-kind for unit 1570, 1572 & 1574.Details
remodel bathroom and kitchen in-kind for unit 1570, 1572 & 1574. | $80,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 214 Ney St | remodel (e) kitchen with same layout of single family dwelling. in kindDetails
remodel (e) kitchen with same layout of single family dwelling. in kind | $15,000 |
| Jul 18, 2023 | Completed final sign-off Sep 2025 | 2472 34th Av | 1/f: remodel/legalize (e) bedrooms, and (e) bath. relocate (e) water heater and replace furnace. add (n) home office. 2/f: remodel (e) bathroom, kitchen and new wiring.Details
1/f: remodel/legalize (e) bedrooms, and (e) bath. relocate (e) water heater and replace furnace. add (n) home office. 2/f: remodel (e) bathroom, kitchen and new wiring. | $177,800 |
| Apr 3, 2023 | Completed final sign-off Sep 2023 | 94 Thrift St | construct 2 bedroom, 1 full bath, & media room w/ wet bar at g/f. remodel (e) kitchen & 2 bathroom on 2/f. repair (e) deck at rear in-kind.Details
construct 2 bedroom, 1 full bath, & media room w/ wet bar at g/f. remodel (e) kitchen & 2 bathroom on 2/f. repair (e) deck at rear in-kind. | $183,500 |
| Jun 30, 2022 | Completed final sign-off Sep 2023 | 3700 Cabrillo St | unit 302 - remodel of (e) kitchen and bathroom on 4th floor.Details
unit 302 - remodel of (e) kitchen and bathroom on 4th floor. | $38,000 |
| May 17, 2022 | Completed final sign-off Jul 2023 | 400 Gates St | 1/f: remodel (e) space to new kitchen, living and new laundry, toilet. 2/f: new bedrooms and bathrooms. new interior stair. replace new windows. new foundation and slab.Details
1/f: remodel (e) space to new kitchen, living and new laundry, toilet. 2/f: new bedrooms and bathrooms. new interior stair. replace new windows. new foundation and slab. | $98,000 |
| Oct 21, 2021 | Completed final sign-off Mar 2023 | 453 Marietta Dr | construct 1 bedroom & 1 full bath at ground floor. remodel (e) kitchen, 1 bathroom, and replace 3 windows on 2nd floor. install (n) 3' x 3' skylight.Details
construct 1 bedroom & 1 full bath at ground floor. remodel (e) kitchen, 1 bathroom, and replace 3 windows on 2nd floor. install (n) 3' x 3' skylight. | $78,000 |
| Oct 12, 2021 | Completed final sign-off Nov 2023 | 343 London St | interior remodel: 1st floor to add a media room, a study room, and a full bathroom. 2nd floor: to remodel extg kitchen, bathroom, add a interior stair connected to 1st floor.Details
interior remodel: 1st floor to add a media room, a study room, and a full bathroom. 2nd floor: to remodel extg kitchen, bathroom, add a interior stair connected to 1st floor. | $80,000 |
| Apr 30, 2021 | Completed final sign-off Jun 2021 | 3814 19th Av | remodel (e) kitchen t single family dweling(in-kind). eletrical rewiring for entire building.Details
remodel (e) kitchen t single family dweling(in-kind). eletrical rewiring for entire building. | $10,000 |
| Mar 25, 2021 | Completed final sign-off Jun 2021 | 3814 19th Av | construct new hallway between garage & bedroom at ground level. remodel (e) kitchen, replace counter, cabinets, sink, & exuahst fan at 2nd fl.Details
construct new hallway between garage & bedroom at ground level. remodel (e) kitchen, replace counter, cabinets, sink, & exuahst fan at 2nd fl. | $32,000 |
| Mar 10, 2021 | Never finaled filed Mar 2021, never issued | 25 Grafton Av | demolish three storage sheds and add a 2-story accessory dwelling unit at rear yard, including living/dining, bedroom, bathroom and kitchen.Details
demolish three storage sheds and add a 2-story accessory dwelling unit at rear yard, including living/dining, bedroom, bathroom and kitchen. | $80,000 |
| Oct 13, 2020 | Completed final sign-off Jun 2021 | 2720 41st Av | construct 1 bedroom, 1 media room/laundry, 1 full bath on ground floor. remodel (e) kitchen & bathroom in-kind at 2nd floor.Details
construct 1 bedroom, 1 media room/laundry, 1 full bath on ground floor. remodel (e) kitchen & bathroom in-kind at 2nd floor. | $48,000 |
| Jul 2, 2020 | Completed final sign-off Jan 2022 | 570 27th Av | comply w/ #201998321: 1)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on 2nd floor (570 27th av). 2)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on grd floor (572 27th av). window replacement will be under separate permit.Details
comply w/ #201998321: 1)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on 2nd floor (570 27th av). 2)re-install kitchen & bathroom. replace (n) insulation, sheetrock, re-wire all elec. on grd floor (572 27th av). window replacement will be under separate permit. | $82,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 118 Huntington Dr | kitchen and bathroom remodeling of existing single family dwelling. all remodel work in-kind.Details
kitchen and bathroom remodeling of existing single family dwelling. all remodel work in-kind. | $25,000 |
| Feb 6, 2020 | Completed final sign-off Mar 2021 | 1457 09th Av | remodel e kitchen and 2 baths of residential unit 1457 a 2nd flDetails
remodel e kitchen and 2 baths of residential unit 1457 a 2nd fl | $40,000 |
| Mar 26, 2019 | Expired or cancelled cancelled Jul 2019 | 2 Nahua Av | complete remodel kitchen and bathroom. kitchen 10'x10', bathroom 8'x8'Details
complete remodel kitchen and bathroom. kitchen 10'x10', bathroom 8'x8' | $32,908 |
| Apr 26, 2018 | Completed final sign-off Feb 2020 | 715 Sargent St | legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14.Details
legalize (e) unauthorized dwelling unit, including (n) entry & skylight for light & ventilation. update entry stair for code conformance & legalize unpermitted shower & kitchen fixtures. legalization per ordinance 43-14. | $15,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2019 | 2215 19th Av | 1st fl add 2 bedrooms, family room, 1 full bath and laundry. 2nd fl reconfigure internal stairs, remodel 2 baths, kitchenDetails
1st fl add 2 bedrooms, family room, 1 full bath and laundry. 2nd fl reconfigure internal stairs, remodel 2 baths, kitchen | $120,000 |
| Mar 15, 2016 | Completed final sign-off Jan 2017 | 1300 Plymouth Av | renovation of extg s.f.d. relocate extg kitchen, bedroom, bathroom and laundry. add one bathroom, replace extg exterior siding. upgrade extg wooden windows in kind.Details
renovation of extg s.f.d. relocate extg kitchen, bedroom, bathroom and laundry. add one bathroom, replace extg exterior siding. upgrade extg wooden windows in kind. | $60,000 |
| Dec 1, 2015 | Never finaled issued Feb 2016, no final | 67 Burlwood Dr | renovate existing kitchen, replace one window, remove one interior partition. new window wood frame aluminum clad.Details
renovate existing kitchen, replace one window, remove one interior partition. new window wood frame aluminum clad. | $28,000 |
| Aug 13, 2013 | Completed final sign-off Dec 2013 | 362 04th Av | ground floor - remodeling kitchen. remove (e) cabinet, countertop, wall cabinet. - new wire for kitchen and living room. new under cabinet light and one center ceiling all let. min 50% total wattage of lighting high efficacy cec 150 (k)Details
ground floor - remodeling kitchen. remove (e) cabinet, countertop, wall cabinet. - new wire for kitchen and living room. new under cabinet light and one center ceiling all let. min 50% total wattage of lighting high efficacy cec 150 (k) | $5,000 |
| Jun 5, 2013 | Completed final sign-off Aug 2013 | 164 Marietta Dr | remodel kitchen, remain existing cabinet, install new counter top and add insulation at exterior side wall min r-13, for kitchen wall only, min. 50% wattage of lighting high efficacy, no chagne in wall & opening layoutDetails
remodel kitchen, remain existing cabinet, install new counter top and add insulation at exterior side wall min r-13, for kitchen wall only, min. 50% wattage of lighting high efficacy, no chagne in wall & opening layout | $4,000 |
| Feb 21, 2013 | Never finaled issued Feb 2013, no final | 2838 Taraval St | replace smoke damage wall and basic cabinet at range side only. replace smoke damage sheet rock as needed. kitchen behind cabinet only.Details
replace smoke damage wall and basic cabinet at range side only. replace smoke damage sheet rock as needed. kitchen behind cabinet only. | $2,500 |
| Jun 20, 2012 | Completed final sign-off Feb 2013 | 28 Precita Av | change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room.Details
change of use from commercial to residential. interior remodel of bathroom, addition of kitchen & media room. | $25,000 |
| Jan 27, 2012 | Completed final sign-off Nov 2012 | 386 Mangels Av | interior remodeling-new kitchen, new bedrooms & new storage. replace windows at ground floor. add habitable space to ground floor (1 bedroom, 1 bathroom & 1 storage) per plan.Details
interior remodeling-new kitchen, new bedrooms & new storage. replace windows at ground floor. add habitable space to ground floor (1 bedroom, 1 bathroom & 1 storage) per plan. | $20,000 |
| Nov 16, 2010 | Completed final sign-off Feb 2011 | 777 San Jose Av | to clarify scope of work on 201008239378. including gr fl 5/8 gyp bd at ceiling and wall, studs at north, south property lines, patch slab with 4" concrete with 3/8" 0 rebar at e 12" oc ea side. 2nd fl: add n ceiling joist to ea of fire damaged in kitchen area. remodel e kitchen and bath, replaceDetails
to clarify scope of work on 201008239378. including gr fl 5/8 gyp bd at ceiling and wall, studs at north, south property lines, patch slab with 4" concrete with 3/8" 0 rebar at e 12" oc ea side. 2nd fl: add n ceiling joist to ea of fire damaged in kitchen area. remodel e kitchen and bath, replace | $25,000 |
| Jun 1, 2010 | Completed final sign-off Sep 2010 | 607 33rd Av | relocated bathroom, furnace & water heater on ground flr. second flr.: relocated kitchen to create space for (n) bedroom #2. (v.i.f.) smoke detector on each bedroom & hallway. no wet bar single family use only.Details
relocated bathroom, furnace & water heater on ground flr. second flr.: relocated kitchen to create space for (n) bedroom #2. (v.i.f.) smoke detector on each bedroom & hallway. no wet bar single family use only. | $20,000 |
| Apr 21, 2004 | Completed final sign-off Jun 2006 | 470 Mangels Av | vertical & horizontal addition. kitchen remodel. rework stairs to garage.Details
vertical & horizontal addition. kitchen remodel. rework stairs to garage. | $65,000 |