Speedy Building And Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 20 permits filed
48 permits since 2000: 29 completed, 13 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 in progress. Typically 201 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | In progress issued Jul 2026 | 3763 Cesar Chavez St | front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor.Details
front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor. | $50,000 |
| Dec 28, 2022 | Completed final sign-off Oct 2024 | 121 States St | construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building.Details
construction of a deck at rear of property. reconfiguration of interior nonstructural walls. relocation of hvac and hw heaters. legalization of non-permitted bathroom. no work in public right of way. no work to front of building. | $25,000 |