Spe Construction Inc.
- Based in
- San Mateo
- On San Francisco permits
- May 2000 to Nov 2023
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 279 days from filing to permit and 410 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 26, 2021 | Completed final sign-off Nov 2024 | 2496 43rd Av | new vertical addition to (e) 2-story sfd. 3rd story: 2 new bedrooms, 2 full baths, entertainment/living room 2 & study. new pneumatic elevator. new exterior roof terrace & cantilevered balcony. new internal staircase from 2nd to 3rd floor. convert partial (e) 1st floor to caregiver suite, bedroom,Details
new vertical addition to (e) 2-story sfd. 3rd story: 2 new bedrooms, 2 full baths, entertainment/living room 2 & study. new pneumatic elevator. new exterior roof terrace & cantilevered balcony. new internal staircase from 2nd to 3rd floor. convert partial (e) 1st floor to caregiver suite, bedroom, | $750,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rdDetails
remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rd | $185,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652.Details
new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652. | $85,000 |
| Aug 9, 2007 | Completed final sign-off Oct 2007 | 2524 Clay St | revision to 200705222005 stair and wall veneer material change from stucco to pre cast veneer. no structural change, cosmetic revision.Details
revision to 200705222005 stair and wall veneer material change from stucco to pre cast veneer. no structural change, cosmetic revision. | $2,000 |
| May 22, 2007 | Completed final sign-off Oct 2007 | 2524 Clay St | redo existing stair at exterior. enlarge existing driveway.Details
redo existing stair at exterior. enlarge existing driveway. | $2,500 |