Back to kitchen remodel contractors
Spark Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2009
- Last 24 months
- 0 permits filed
218 permits since 2000: 158 completed, 21 never finaled, 39 expired or cancelled.
Of the 21 never-finaled permits, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
27 kitchen remodel permits: 23 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2009 | Completed final sign-off Jul 2009 | 42 August Al | remodel of single family residence, new kitchen, bar area, window at lightwel, plumbing, electrical, selective structural work.Details
remodel of single family residence, new kitchen, bar area, window at lightwel, plumbing, electrical, selective structural work. | $200,000 |
| Dec 3, 2008 | Completed final sign-off Mar 2009 | 1080 Page St | surface kitchen repairs. 'emergency work due to flood rehabilitation'. kitchen repairs, not remodel. same size & location. no new walls or relocate. all non-structural work.Details
surface kitchen repairs. 'emergency work due to flood rehabilitation'. kitchen repairs, not remodel. same size & location. no new walls or relocate. all non-structural work. | $6,200 |
| Aug 26, 2008 | Completed final sign-off Mar 2009 | 404 Gold Mine Dr | remodel 2nd fl bathrooms, first fl kitchen & bathrm remodel, ground fl bathroom, replace 2 windows in kind, remove 1 window, 1 door and add 1 new window.Details
remodel 2nd fl bathrooms, first fl kitchen & bathrm remodel, ground fl bathroom, replace 2 windows in kind, remove 1 window, 1 door and add 1 new window. | $75,000 |
| Jul 3, 2008 | Completed final sign-off Oct 2008 | 765 42nd Av | remodel second floor kitchen. part of (e) patio becomes additional kitchen square footage (not seen from exterior. not visible from street) replace (e) door, replace 2 (e) windows.Details
remodel second floor kitchen. part of (e) patio becomes additional kitchen square footage (not seen from exterior. not visible from street) replace (e) door, replace 2 (e) windows. | $30,000 |
| Jun 19, 2008 | Completed final sign-off Nov 2008 | 450 Scott St | remodel 3rd floor ktichen & bathroom, remove walls in bath & kitchen area, remove fireplace, relocate rear door, replace 2 (e) windows, structural work to include new posts & new footing.Details
remodel 3rd floor ktichen & bathroom, remove walls in bath & kitchen area, remove fireplace, relocate rear door, replace 2 (e) windows, structural work to include new posts & new footing. | $30,000 |
| Jul 6, 2007 | Completed final sign-off Dec 2007 | 3922 22nd St | interior remodeling including renovation of existing kitchen, removal of bearing & non bearing walls, removal of (e) sliding glass door, installation of (n) header, install (n) french door, 2 hardy frames, 2 beams, (n) toilet room, filling of a window.Details
interior remodeling including renovation of existing kitchen, removal of bearing & non bearing walls, removal of (e) sliding glass door, installation of (n) header, install (n) french door, 2 hardy frames, 2 beams, (n) toilet room, filling of a window. | $50,000 |
| May 11, 2007 | Completed final sign-off May 2009 | 433 Texas St | remove rear bay, repair dry rot , remodel kitchen, interior stair, add dowstairs bathr and closet. all skylights and parapetDetails
remove rear bay, repair dry rot , remodel kitchen, interior stair, add dowstairs bathr and closet. all skylights and parapet | $380,000 |
| May 3, 2006 | Completed final sign-off Aug 2006 | 2090 Pacific Av | surface remodel of 1 bath and kitchen. non structuralDetails
surface remodel of 1 bath and kitchen. non structural | $45,000 |
| Mar 21, 2006 | Completed final sign-off Aug 2007 | 1439 16th Av | renovate kitchen, infill lightwell at kitchen.Details
renovate kitchen, infill lightwell at kitchen. | $200,000 |
| Feb 23, 2006 | Completed final sign-off Jun 2006 | 359 Diamond St | kitchen and bath remodel surface - no structural - replace cabinets and appliances in the kitchenDetails
kitchen and bath remodel surface - no structural - replace cabinets and appliances in the kitchen | $37,000 |
| Dec 1, 2005 | Completed final sign-off May 2006 | 71 Hancock St | removeing wall between dining room and kitchen adding (n) beam & (n) posts on 2nd floor an (n)steel beam and post in garage (n) footing also ott foundation arond crawl space. in bathroom adding non-bearing walls (n) shower and (n) sinkDetails
removeing wall between dining room and kitchen adding (n) beam & (n) posts on 2nd floor an (n)steel beam and post in garage (n) footing also ott foundation arond crawl space. in bathroom adding non-bearing walls (n) shower and (n) sink | $25,000 |
| Nov 7, 2005 | Completed final sign-off Nov 2006 | 519 Kirkham St | surface kitchen remodel installing new pantry. new gas line for new range. removing cabinents. installing new hnad sink. work in 519 unit# 1 only.Details
surface kitchen remodel installing new pantry. new gas line for new range. removing cabinents. installing new hnad sink. work in 519 unit# 1 only. | $35,000 |
| Sep 28, 2005 | Never finaled issued Sep 2005, no final | 71 Hancock St | surface remodel of kitchenand bath on 2nd floorDetails
surface remodel of kitchenand bath on 2nd floor | $60,000 |
| Jun 28, 2005 | Completed final sign-off Nov 2005 | 747 Duncan St | surface remodel of kitchen & bath on main level.replace hardwood flooring in living room on upperDetails
surface remodel of kitchen & bath on main level.replace hardwood flooring in living room on upper | $45,000 |
| May 3, 2005 | Completed final sign-off Aug 2005 | 1075 Fell St | surface remodel of bath & kitchen. fluorescent lights in kitchen and bath. kitchen: n countertops,Details
surface remodel of bath & kitchen. fluorescent lights in kitchen and bath. kitchen: n countertops, | $20,000 |
| Jun 30, 2004 | Completed final sign-off Dec 2004 | 21 Albion St | kitchen remodel incl.slight alteration of non bearing wall & replace (e)windows.conversion of lessDetails
kitchen remodel incl.slight alteration of non bearing wall & replace (e)windows.conversion of less | $40,000 |
| Jun 24, 2004 | Completed final sign-off Dec 2004 | 21 Albion St | renovation of kitchen, repl cabinets, fixtures, lighting, windows, smoke detectorsDetails
renovation of kitchen, repl cabinets, fixtures, lighting, windows, smoke detectors | $20,000 |
| Jun 24, 2004 | Never finaled issued Jul 2004, no final | 4107 17th St | remove (e) habitable space in basement including (e) bathroom, kitchen, plumbing & electricalDetails
remove (e) habitable space in basement including (e) bathroom, kitchen, plumbing & electrical | $6,000 |
| Mar 31, 2003 | Completed final sign-off Nov 2003 | 265 Avila St | kitchen remodel at first floor & replace window & door at kitchen. remodel grd flr bathroom & addDetails
kitchen remodel at first floor & replace window & door at kitchen. remodel grd flr bathroom & add | $65,000 |
| Jan 30, 2003 | Never finaled issued Jan 2003, no final | 55 Ashbury Tr | remodel kitchen and revise pa#2002/12/27/4244 bath remodel, relocate & change windows at side ofDetails
remodel kitchen and revise pa#2002/12/27/4244 bath remodel, relocate & change windows at side of | $55,000 |
| Apr 17, 2002 | Completed final sign-off Nov 2002 | 80 Vicksburg St | interior remodel: kitchen, bathroom, reconfiguration of spaces, no struct work, replace rear windowDetails
interior remodel: kitchen, bathroom, reconfiguration of spaces, no struct work, replace rear window | $250,000 |
| Sep 21, 2001 | Completed final sign-off May 2002 | 261 Buena Vista East Av | kitchen remodel & electrical upgrade,lightwell at 1st flr over basementDetails
kitchen remodel & electrical upgrade,lightwell at 1st flr over basement | $35,000 |
| Mar 23, 2001 | Completed final sign-off Sep 2001 | 300 03rd St | remodel kitchen & living room surfaceDetails
remodel kitchen & living room surface | $35,000 |
| Sep 25, 2000 | Completed final sign-off Feb 2001 | 1760 Pacific Av | kitchen surface remodel unit #4Details
kitchen surface remodel unit #4 | $22,000 |
| Sep 6, 2000 | Completed final sign-off Jun 2001 | 177 Dalewood Wy | proposed new deck at 2nd level with new exit door from kitchen-rear elevationDetails
proposed new deck at 2nd level with new exit door from kitchen-rear elevation | $14,500 |
| Jul 12, 2000 | Completed final sign-off Dec 2000 | 1451 37th Av | remodel existing kitchen & bathroom on upper level. cover existing inner courtyard w/clerestory.Details
remodel existing kitchen & bathroom on upper level. cover existing inner courtyard w/clerestory. | $128,000 |
| Jul 12, 2000 | Expired or cancelled expired Jan 2001 | 1139 Lake St | renewal of application 9912135 remodel kitchen & living room as per previous plans.Details
renewal of application 9912135 remodel kitchen & living room as per previous plans. | $15,000 |