Sp Environmental Inc
- Based in
- El Granada
- On San Francisco permits
- Apr 2013 to Apr 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 42 days from filing to permit and 582 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2013 | Completed final sign-off Jan 2015 | 368 Highland Av | demolish entry deck/stairway, rebuild deck/stairway structural in place. clean/dispose of all debris, prepair around for new concrete slab as a base for new wooden stairway structure, install #3 rebar,pour 6" conc slab position galvanized 5/8" anchors as mud sill holders,pressure treated wd redwood.Details
demolish entry deck/stairway, rebuild deck/stairway structural in place. clean/dispose of all debris, prepair around for new concrete slab as a base for new wooden stairway structure, install #3 rebar,pour 6" conc slab position galvanized 5/8" anchors as mud sill holders,pressure treated wd redwood. | $16,600 |