Back to kitchen remodel contractors
Southland Industries
- Based in
- Garden Grove
- On San Francisco permits
- Apr 2005 to Dec 2024
- Last 24 months
- 2 permits filed
19 permits since 2000: 13 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 12 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2015 | Completed final sign-off Jan 2016 | 800 Howard St | installation of new ductwork, hydronic piping, plumbing as part of new kitchen space. kitchen to be used for prep only, no cooking. commercial kitchen permitted by pa#201505146378, add two (2) fire smoke dampers.Details
installation of new ductwork, hydronic piping, plumbing as part of new kitchen space. kitchen to be used for prep only, no cooking. commercial kitchen permitted by pa#201505146378, add two (2) fire smoke dampers. | $190,000 |
| Aug 4, 2015 | Completed final sign-off Feb 2016 | 1200 Van Ness Av | ste.#200 - mechanical remodel/update (e) water service heat pumps with new. plumbing remodel. add bathroom and update breakroom kitchen. ref pa 2015 0723 2309. maher naDetails
ste.#200 - mechanical remodel/update (e) water service heat pumps with new. plumbing remodel. add bathroom and update breakroom kitchen. ref pa 2015 0723 2309. maher na | $250,000 |